RC EAST: QA/QC PROJECT
PRT Engineer and WOLFPACK CAT-A conducted QA/QC of a mosque refurbishment in Tere Zai District.
|
|
RC EAST: QA/QC PROJECT
PRT assessment team spent the day engaging with Nawur district leaders, assessing the district government, agriculture, police, and potential projects.
|
|
RC EAST: QA/QC PROJECT
We also did a QA/QC on the new district center.
|
|
RC EAST: QA/QC PROJECT
Report Title: QA/QC of Mehtar Lam Detention Facility Refurbishment
PRT Comments: The following deficiencies were noted for the Mehtar Lam Detention Facility Refurbishment: Insufficient mortar between vertical joints between bricks, mixing of mortar on the ground instead of in a wheelbarrow or mechanical mixer, insufficent amounts of cement in the mortar mix, insuffient mortar between joints in the top course of the concrete block wall.
|
|
RC EAST: QA/QC PROJECT
Report Title: Bridge Assessment-Zurmat
PRT Comments: A condition assessment was conducted on a bridge approximately 40m long 3.
|
|
RC EAST: QA/QC PROJECT
Report Title: Qarghayi District Center Micro Hydro QA Inspection
PRT Comments: 04OCT2006 Canal dug, retaining wall mostly complete, concrete floor still needs to be laid.
|
|
RC EAST: QA/QC PROJECT
(Delayed Report) MAJ Johnson also met with the Governor and the contractors for the Mahmoud Raqi High School project.
|
|
RC EAST: QA/QC PROJECT
(Delayed Report) The Parwan team went to Salang and conducted a QA on the Jafarak Bridge.
|
|
RC EAST: QA/QC PROJECT
To access status of Project. 42S XD 01555 45055
LT Sakai, LT Masuck and CA did a QA inspection of the Sabrabad MHP ...
|
|
RC EAST: QA/QC PROJECT
Zormat District Center Pre-construction and Agricultural Extension Center QA/QC
PRT Comments: DORA (Development Organization for the Revival of Afghanistan) will start construction on 16 October 2006 for the well and generator addition to the Zormat District Center.
|
|
RC EAST: QA/QC PROJECT
PRT AED engineer conducted a site visit of the Gelan PRT Engineers and CA
What: QA/QC of Municipal Building
Where: Mehtar Lam City
Why: Assure that construction is to standard
An inspection of the Municipal Building was conducted by the PRT engineers and CA.
|
|
RC EAST: QA/QC PROJECT
When: 12 OCT 06
Who: PRT Engineers and CA
What: QA/QC of Hospital Road Improvement
Where: Mehtar Lam City
Why: Assure that construction is to standard
Rehabilitation of the Hospital Road has begun.
|
|
RC EAST: QA/QC PROJECT
When: 12 OCT 06
Who: PRT Engineers and CA
What: QA/QC of Metropolitan Road Improvement
Where: Mehtar Lam City
Why: Assure that construction is to standard
Inspection of the road construction revealed the following: Lack of an on-site supervisor, an inadequate amount of laborers, cold asphalt being layed, and inadequate compaction due to the roller operator waiting too long before compacting the surface.
|
|
RC EAST: QA/QC PROJECT
Sabrabad Microhydro
PRT Comments: PRT conducted inspection of constution progress, Stone foundation and brick masonry completed for generator housing.
|
|
RC EAST: QA/QC PROJECT
Inspection of April Martyr School Construction Project in Nowabad Village
PRT Comments: On 16 October 2006, the PRT Engineers inspected the construction of the April Martyr School project in Nowabad Village, Asadabad District, Kunar Province.
|
|
RC NORTH: QA/QC PROJECT
The first phase of repairs on the Bazarak boys high school is now completed. The school was damaged by a pipe bomb in July ...
|
|
RC EAST: QA/QC PROJECT
Inspection of Asadabad Road Paving Project Site
PRT Comments: On 16 October 2006, the PRT Engineers inspected one of the sites where work was being conducted on the Asadabad Road Paving project.
|
|
RC WEST: QA/QC PROJECT
Commander&. amp ...
|
|
RC EAST: QA/QC PROJECT
Meeting with Rahimullah, contractor. Conducted a foot patrol to Urmal Village to put eyes on CERP project #2357 (Micro-Hydro) ...
|
|
RC EAST: QA/QC PROJECT
District: Kherwar Village or MGRS: 42S WC 91644 24410
Report Title: New Kherwar District Center
PRT Comments
No work has been begun on the district center.
|
|
RC EAST: QA/QC PROJECT
QA/QC Mission. PRT Comments: Pushed Engineer element out to conduct QA/QC on Waza Khwa, Wor Mamay, Dila, and Kushamond PRT conducted QA/QC of the Musa Keil road widening project.
|
|
RC EAST: QA/QC PROJECT
On 6 November the PRT traveled to Omna to QA/QC the ongoing PRT Assessment: AED engineer representative, SFC Foor, traveled with the PRT to the district center and met with employees from Amerifa ...
|
|
RC EAST: QA/QC PROJECT
New DC Assessements: There are new assessments in the projects portion of PCC construction progress at the Laghman Provincial ANP compound.
|
|
RC EAST: QA/QC PROJECT
A QA/QC was conducted for the Mehtar Lam Municipal Building.
|
|
RC EAST: QA/QC PROJECT
Paktya Governors Compound and University Power Assessment
PRT Comments: 0830hrs at Paktya Governors Compound, we completed the first power assessment for a future solar power project.
|
|
RC EAST: QA/QC PROJECT
The PRT had a successful mission visiting three (3) construction sites today, Gelan DC Site Visits
PRT Comments There are new notes in the project reporting page for Dila, Kushamond, Waza Khwa, Wor Mamay and Terwa QA/QCd the Elmara Mosque in Nadir Shah Kot.
|
|
RC EAST: QA/QC PROJECT
Today the PRT conducted an assessment of the Qarghahy&. amp ...
|
|
RC EAST: QA/QC PROJECT
Assessment of District Center
PRT Comments: We spoke to the District Commissioner regarding the current building conditions.
|
|
RC EAST: QA/QC PROJECT
Today we conducted a QA/QC of the Spera Irrigation Dam.
|
|
RC EAST: QA/QC PROJECT
Ultimor Health Clinic QA/QC
PRT Comments: From all indications a contract was let to refurbish this clinic by USAID for work to include a security wall &.
|
|
RC EAST: QA/QC PROJECT
Poraq Health Clinic QA/QC
PRT Comments: From all indications a contract was let to refurbish this clinic by USAID for work to include a security wall, interior paint/patch and grounds improvement.
|
|
RC EAST: QA/QC PROJECT
PRT assessment team conducted visit to Faroki bridge (downtown Ghazni City), the Teachers Training Institute and the Rowza dam projects to review project progress with the contractors.
|
|
RC EAST: QA/QC PROJECT
PRT Engineer conducted QA/QC assessment at Khayr Khot, Yahya Khel, and Shakhilabad PRT. The governor has spoken to Mountain 6 on this project ...
|
|
RC EAST: QA/QC PROJECT
PRT Engineer conducted QA/QC assessment of Omna QA/QC was conducted at an Agriculture Extension Center construction site in Logar.
|
|
RC EAST: QA/QC PROJECT
Meeting at Sabrabad Village with Mohamad Dawood, Cousin of village elder to discuss QA/QC of Micro-Hydro Project (MHP).
|
|
RC EAST: QA/QC PROJECT
The Sabrabad MHP project is proceeding according to schedule. The remaining work to be completed includes installation of the dynamo, penstock, and construction of the ceiling for the powerhouse ...
|
|
RC EAST: QA/QC PROJECT
Engineer&. amp ...
|
|
RC EAST: QA/QC PROJECT
Regarding the Andar DC security wall, 75% of the foundation has been dug out ...
|
|
RC EAST: QA/QC PROJECT
QA/QC of Municipal Building
PRT Comments
When: 28 Nov 06
Who: PRT Engineer and CA
What: QA/QC of Municipal Building
Where: Mehtar Lam City
Why: Assure that construction is to standard
An inspection of the Municipal Building was conducted by the PRT engineer and CA.
|
|
RC EAST: QA/QC PROJECT
PRT team B conducted operations in Wor Mamay and Terwa districts conducting QA/QC on the district center projects and leader engagements.
|
|
RC EAST: QA/QC PROJECT
QA/QC of Mehtar Lam Detention Facility Refurbishment
PRT Comments
When: 28 Nov 06
Who: PRT Engineer and CA
What: QA/QC of Mehtar Lam Detention Facility Refurbishment
Where: Mehtar Lam City
Why: Assure that construction is to standard
An inspection of the Mehtar Lam Detention Facility Refurbishment was conducted.
|
|
RC EAST: QA/QC PROJECT
Civil Affairs Team and PRT Engineers conducted QA/QC mission to several projects in Matun District.
|
|