RC EAST: SNOW REMOVAL
Governor is going to form a commission to coordinate employment of locals to clear snow. PRT working to secure funding to facilitate this ...
|
|
RC EAST: SNOW REMOVAL
The SNIC contractor worked on the road from Puli-Alam toward Kharwar and will continue working this road tomorrow. We received word that seven children and three adults have died in Kharwar due to weather conditions ...
|
|
RC EAST: SNOW REMOVAL
TF Catamount reported that the routes from FOB OE to FOB Bermel (WB 144 400 - WB 225 140) and FOB OE to FOB Tillman (WB 144 400 - WB 435 446) required clearing.
|
|
RC EAST: SNOW REMOVAL
The following report was provided by the SNIC Contract Supervisor: Ring Road from Ghazni north Two graders cleared snow and ice. Two dump trucks spread salt and sand ...
|
|
RC EAST: SNOW REMOVAL
SNIC: the road to Zormat had been plowed and was in good condition during the mission today. The contractor was also working on the roads to Kharwar and Chamkani ...
|
|
RC EAST: SNOW REMOVAL
The SNIC contractor has completed clearing the road to Kharwar. However, now that EID has started the Jingle truck will not head in for a couple more days ...
|
|
RC EAST: SNOW REMOVAL
PRT met with SNIC contract supervisor to review status of snow removal and identify ways to improve his performance.
|
|
RC EAST: SNOW REMOVAL
SNIC contractor reported that they plowed Ghazni to Jaghatu Road. ...
|
|
RC EAST: SNOW REMOVAL
Overall, the main roads of Kunar remain open from snow but have had several mudslides and partial washouts that are being fixed by contractors if they are working on that portion of the road.
|
|
RC WEST: SNOW REMOVAL
Snow removal: A CERP-funded contract with a Panjshiri contractor is now in place to provide snow removal from kilometer 47 of the Panjshir Road north to the Paryan District Center and east to the Dara District center.
|
|
RC EAST: SNOW REMOVAL
SNIC contractor worked more on the roads to Kharwar and Azra. In Kharwar he has reached the PRT Comments: On 05Jan07, PRT Engineers met with Engineer Shakirullah Shakir from the Rural Rehabilitation Development.
|
|
RC EAST: SNOW REMOVAL
SNIC to Kharwar apparently done poorly - passage only enough for HILUX vehicles. Contact initiated with contractor for reattack ...
|
|
RC EAST: SNOW REMOVAL
There are no workers hired to clear the roads that influence Parwan on the SNIC contract.
We called the supervisor and translator for the Parwan Province ...
|
|
RC EAST: SNOW REMOVAL
SNIC in Tera Pass still quite inadequate. Central portion of the pass remains covered with ice up to 6& ...
|
|
RC EAST: SNOW REMOVAL
The PRT engineers are working with Spartan and CJTF 76 CJ7 to include the Wama to Paruns road in the snow removal contract.
|
|
RC EAST: SNOW REMOVAL
PRT and Governor Patan also discussed hiring men to shovel snow. Governor says that he can hire 700 men to do this work ...
|
|
RC WEST: SNOW REMOVAL
Road clearing contract signed: Panjshir PRT signed its own road clearing contract for the segment of the Panjshir road from the end of the USAID-funded road north to the Paryan district center and east to the Dara district center.
|
|
RC EAST: SNOW REMOVAL
SNIC on the Gardez airfield is inadequate for PRT Air to use the airfield. Contractor has piled snow / ice too close and is not adequately clearing the runway ...
|
|
RC EAST: SNOW REMOVAL
I had the duputy Governor drive the Public Works Director to the PRT to discuss SNIC operations.
|
|
RC EAST: SNOW REMOVAL
Gov Taqwa had an issue with the SNIC contractor in ShinWari. He said that the contractor had workers get out on the road and shovel when there wasn& ...
|
|
RC SOUTH: SNOW REMOVAL
PRT and DOS reps went to Shahjoy today to give the first installment of money to the 63 workers hired for the Snow and Ice Removal Program.
|
|
RC EAST: SNOW REMOVAL
Current Road Conditions / Road status changes: Poor, contractor working on roads.
We postponed today& ...
|
|
RC EAST: SNOW REMOVAL
Heavy snowfall today caused the cancellation of today&. amp ...
|
|
RC EAST: SNOW REMOVAL
We talked to the Shams Construction Company today about snow and ice removal. The company told us they had 20 employees working on the Solanak area, which is the area between Mahmud Raqi and Nijrab ...
|
|
RC WEST: SNOW REMOVAL
Snow: Panjshir received another foot of snow yesterday paralyzing PRT operations. ENTES is currently clearing the USAID road and the PRT is working with local contractors to get the rest of the road clear ...
|
|
RC EAST: SNOW REMOVAL
The Kapisa Team called Eqbal, the Kapisa contractor for the Amin Dabaz Construction Company, which has the SNIC contract for Afghanistan. He told us that he met with the Public Works chief of Kapisa, in order to pinpoint key areas for snow removal, and began snow removal in the Nowabad and Alasai areas ...
|
|
RC EAST: SNOW REMOVAL
The asphalt roads look very good. Bagram and Old Kabul Roads are clear with occasional ice or water on the surface ...
|
|
RC EAST: SNOW REMOVAL
PRT COMDR MET WITH DIR PUBLIC WORKS (DPW) TO CLARIFY THE PRTS POSITION ON SNIC. COMD STATED THAT THE PRT WOULD NOW STOP NEGOTIATIONS (AFTER SIX WEEKS OF EFFORT), AND THAT DPW WOULD HAVE TO PICK UP THE EFFORT ...
|
|
RC EAST: SNOW REMOVAL
The asphalt roads look very good. Bagram and Old Kabul Roads are clear with occasional ice or water on the surface ...
|
|
RC EAST: SNOW REMOVAL
The asphalt roads look very good. Bagram and Old Kabul Roads are clear with occasional ice or water on the surface ...
|
|
RC EAST: SNOW REMOVAL
Unable to contact the contractor on several attempts throughout the day. It seems he is out of service area ...
|
|
RC EAST: SNOW REMOVAL
The Comd NZPRT and CERP representative met with Gov Sarabi again late this afternoon to discuss the continuing saga of the SNIC contract, including the contract amount, Governor&.
|
|
RC EAST: SNOW REMOVAL
Contacted the SNIC Contractor, Iqbal Shah: 0799841836. His office is in Bagram ...
|
|
RC EAST: SNOW REMOVAL
Contacted the SNIC Contractor, Iqbal Shah: 0799841836. His office is in Bagram ...
|
|
RC EAST: SNOW REMOVAL
It has snowed for the past 18 hours in Ghazni. The temperature is at or near freezing ...
|
|
RC EAST: SNOW REMOVAL
It is snowing in Paktya Province, and Kharwar and Charkh Districts in Logar. The roads to Kharwar and Charkh are not open ...
|
|
RC EAST: SNOW REMOVAL
We called the SNIC contractor regarding the inclement weather in the area. He stated that there were currently no snow or ice problems in the province ...
|
|
RC EAST: SNOW REMOVAL
Province
Paktika Monitoring Unit
PRT SHARANA Location Grid
42SVB7998270310
--------------------------------------------------------------------------------
Method of Execution
Contractor Location Condition
Snow Status
Completed
--------------------------------------------------------------------------------
Contracted Location.
|
|
RC EAST: SNOW REMOVAL
Information Operations: Gov Rahmat reported that the ineffectiveness of the SNIC contractor was a major topic on National TV and that the negative publicity was undermining his credibility, as well as that of the national government.
|
|
RC EAST: SNOW REMOVAL
The Bagram PRT Parwan Team called the SNIC contractor regarding the inclement weather in the area.
|
|
RC EAST: SNOW REMOVAL
The Bagram PRT Parwan Team called the SNIC contractor regarding the inclement weather in the area.
|
|
RC EAST: SNOW REMOVAL
SNIC: progress is slow and there are a lot of different impressions concerning the speed of the contractors. The Afghans are largely dissatisfied with the implementation of the contract ...
|
|
RC EAST: SNOW REMOVAL
Province
Ghazni Monitoring Unit
PRT GHAZNI Location Grid
42SVC4600012000
--------------------------------------------------------------------------------
Method of Execution
Contractor Location Condition
Snow Status
On-going
--------------------------------------------------------------------------------
Contracted Location.
|
|
RC EAST: SNOW REMOVAL
Province
Paktika Monitoring Unit
PRT SHARANA Location Grid
42SVB7998270310
Method of Execution
Contractor Location Condition
Snow Status
On-going
Contracted Location.
|
|
RC EAST: ROUTE STATUS REPORT; ROUTE AUDI
*****ROUTE STATUS REPORT*****
1. 4/A/37 (RCP5A)
2 ...
|
|
RC EAST: SNOW REMOVAL
Province
Paktika Monitoring Unit
PRT SHARANA Location Grid
42SVB7998270310
--------------------------------------------------------------------------------
Method of Execution
Contractor Location Condition
Snow Status
On-going
--------------------------------------------------------------------------------
Contracted Location.
|
|
RC EAST: SNOW REMOVAL
Zeruk shura members paid an unannounced visit to PRT Sharana on 15 Feb 07 to discuss poor road conditions in the District.
|
|
RC EAST: 180530Z TF Cincinnatus Bagram PRTMeeting with the Department of Public Works in Jabulsaraj.
Parwan team met with General Rajab, the Director of Salang Region of Public Works, at the Department of Public Works in Jabulsaraj. The topic of todays discussion was the Salang equipment the PRT purchased to help maintain and keep the Salang road passage open ...
|
|