Identifier
Created
Classification
Origin
09SEOUL391
2009-03-13 06:32:00
SECRET
Embassy Seoul
Cable title:  

ROK NOTIFICATION OF MISSILE SYSTEM PRODUCTION

Tags:  MARR MCAP KPAL KS 
pdf how-to read a cable
VZCZCXYZ0005
PP RUEHWEB

DE RUEHUL #0391 0720632
ZNY SSSSS ZZH
P 130632Z MAR 09
FM AMEMBASSY SEOUL
TO RUEHC/SECSTATE WASHDC PRIORITY 3583
INFO RUEHBJ/AMEMBASSY BEIJING PRIORITY 5390
RUEHBY/AMEMBASSY CANBERRA PRIORITY 8854
RUEHKO/AMEMBASSY TOKYO PRIORITY 5498
RUEHIN/AIT TAIPEI PRIORITY 3012
RHMFISS/COMUSFK SEOUL KOR PRIORITY
RUACAAA/COMUSKOREA INTEL SEOUL KOR PRIORITY
RHMFISS/COMUSKOREA J5 SEOUL KOR PRIORITY
RHEHNSC/NSC WASHINGTON DC PRIORITY
RUEKJCS/SECDEF WASHINGTON DC//OSD/ISA/EAP// PRIORITY
RUEHUL/USDAO SEOUL KOR PRIORITY
S E C R E T SEOUL 000391

SIPDIS

E.O. 12958: DECL: 03/12/2019
TAGS: MARR MCAP KPAL KS
SUBJECT: ROK NOTIFICATION OF MISSILE SYSTEM PRODUCTION

Classified By: POLMC Joseph Yun, Reasons 1.4 (b,d)

(S) On March 12, POLOFF received the following notification
on the production of a missile system from Kim Hyon-du of the
ROK-U.S. Security Cooperation Division of the Ministry of
Foreign Affairs and Trade.

BEGIN TEXT:

In accordance with the New Missile Guidelines of the ROKG
adopted on January 17, 2001, the ROKG provides the USG with
information on the production of a missile system as follows:
(a) Name of the missile system: NHK-II PIP
(b) Notification category: Part 3(a) of the New Missile
Guidelines
(c) Name and location of the final production/assembly
facility:
Final production/assembly will be conducted at HANWHA
Corporation in Taejon, Republic of Korea
(d) Number of annual production of the system:
The additional NHK-II PIP Block-A missiles will be produced
as follows.
- FY09: 15 rounds
- FY10: 15 rounds plus 2 rounds (ASP: Annual Service Practice)
- FY11: 15 rounds plus 4 rounds (ASP)

*The first production for deployment of the NHK-II PIP
Block-A missiles, which was notified in the technical
consultation in June 2005, has been completed. Since the
NHK-II PIP Block-B missile is still under development, the
production schedule of the Block-B missiles will be informed
to the USG when it begins.

END OF TEXT.
STEPHENS

Share this cable

 facebook -  bluesky -