Identifier
Created
Classification
Origin
09SEOUL391
2009-03-13 06:32:00
SECRET
Embassy Seoul
Cable title:  

ROK NOTIFICATION OF MISSILE SYSTEM PRODUCTION

Tags:  MARR MCAP KPAL KS 
pdf how-to read a cable
VZCZCXYZ0005
PP RUEHWEB

DE RUEHUL #0391 0720632
ZNY SSSSS ZZH
P 130632Z MAR 09
FM AMEMBASSY SEOUL
TO RUEHC/SECSTATE WASHDC PRIORITY 3583
INFO RUEHBJ/AMEMBASSY BEIJING PRIORITY 5390
RUEHBY/AMEMBASSY CANBERRA PRIORITY 8854
RUEHKO/AMEMBASSY TOKYO PRIORITY 5498
RUEHIN/AIT TAIPEI PRIORITY 3012
RHMFISS/COMUSFK SEOUL KOR PRIORITY
RUACAAA/COMUSKOREA INTEL SEOUL KOR PRIORITY
RHMFISS/COMUSKOREA J5 SEOUL KOR PRIORITY
RHEHNSC/NSC WASHINGTON DC PRIORITY
RUEKJCS/SECDEF WASHINGTON DC//OSD/ISA/EAP// PRIORITY
RUEHUL/USDAO SEOUL KOR PRIORITY
S E C R E T SEOUL 000391 SIPDIS E.O. 12958: DECL: 03/12/2019 TAGS: MARR MCAP KPAL KS SUBJECT: ROK NOTIFICATION OF MISSILE SYSTEM PRODUCTION Classified By: POLMC Joseph Yun, Reasons 1.4 (b,d) (S) On March 12, poloff received the following notification on the production of a missile system from Kim Hyon-du of the ROK-U.S. Security Cooperation Division of the Ministry of Foreign Affairs and Trade. BEGIN TEXT: In accordance with the New Missile Guidelines of the ROKG adopted on January 17, 2001, the ROKG provides the USG with information on the production of a missile system as follows: (a) Name of the missile system: NHK-II PIP (b) Notification category: Part 3(a) of the New Missile Guidelines (c) Name and location of the final production/assembly facility: Final production/assembly will be conducted at HANWHA Corporation in Taejon, Republic of Korea (d) Number of annual production of the system: The additional NHK-II PIP Block-A missiles will be produced as follows. - FY09: 15 rounds - FY10: 15 rounds plus 2 rounds (ASP: Annual Service Practice) - FY11: 15 rounds plus 4 rounds (ASP) *The first production for deployment of the NHK-II PIP Block-A missiles, which was notified in the technical consultation in June 2005, has been completed. Since the NHK-II PIP Block-B missile is still under development, the production schedule of the Block-B missiles will be informed to the USG when it begins. END OF TEXT. STEPHENS

Share this cable

 facebook -  bluesky -