NIAMEY FY10 CONSOLIDATED OBO ANNUAL BUDGET CALL FOR

Tags:  ABLD ABUD AMGT AFIN 
pdf how-to read a cable
VZCZCXYZ0001
RR RUEHWEB

DE RUEHNM #0474/01 1771056
ZNR UUUUU ZZH
R 261056Z JUN 09
FM AMEMBASSY NIAMEY
TO SECSTATE WASHDC 5136
UNCLAS NIAMEY 000474 

SIPDIS

OBO for Area Manager and AF/EX for PMO Johnston

E.O. 12958: N/A
TAGS: ABLD ABUD AMGT AFIN
SUBJECT: NIAMEY FY10 CONSOLIDATED OBO ANNUAL BUDGET CALL FOR
MAINTENANCE AND IMPROVEMENT REQUIREMENTS

REF: a) STATE 00044506, b) OIG Report of Inspection, Embassy Niamey,
Niger, ISP-1-09-22A, March 2009

Please find below Embassy Niamey's prioritized list of projects for
consideration in the OBO Annual Budget Call exercise per ref A.
Post has undertaken a thorough review of maintenance and improvement
requirements and identified nine projects for consideration. Three
of these projects are critical to post operations and involve
replacement of equipment that has far surpassed a normal replacement
cycle. Equipment failures of chillers and generators would leave
post in an almost impossible situation. Five other projects are
urgent and involve health (sewage) and safety (electrical and
flooding) considerations. The final project is based on an OIG
recommendation from the November 2008 inspection (ref B).

UNCLAS NIAMEY 000474 SIPDIS OBO for Area Manager and AF/EX for PMO Johnston E.O. 12958: N/A TAGS: ABLD ABUD AMGT AFIN SUBJECT: NIAMEY FY10 CONSOLIDATED OBO ANNUAL BUDGET CALL FOR MAINTENANCE AND IMPROVEMENT REQUIREMENTS REF: a) STATE 00044506, b) OIG Report of Inspection, Embassy Niamey, Niger, ISP-1-09-22A, March 2009 Please find below Embassy Niamey's prioritized list of projects for consideration in the OBO Annual Budget Call exercise per ref A. Post has undertaken a thorough review of maintenance and improvement requirements and identified nine projects for consideration. Three of these projects are critical to post operations and involve replacement of equipment that has far surpassed a normal replacement cycle. Equipment failures of chillers and generators would leave post in an almost impossible situation. Five other projects are urgent and involve health (sewage) and safety (electrical and flooding) considerations. The final project is based on an OIG recommendation from the November 2008 inspection (ref B). ¶1. (U) ¶A. Niamey, Niger ¶B. Replace GSO Building Chillers ¶C. Description of Project: Purchase, ship, and install two (2) new 380v, 50Hz, 60 ton chillers to replace the 40 year old units presently at post. ¶D. Post Rating: Critical ¶E. Special Considerations: a) Controlled Access Area? NO b) Construction Security Plan Required? NO c) Fire/Life Safety Issue? NO d) Hazardous Material Issues? NO e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? NO ¶F. Justification: Parts are no longer available for this chiller, which provides cooling to critical areas of the Embassy, including the Consular, General Services, and Financial Management sections. Neither of the two chillers has sufficient individual capacity to cool the building during the high heat load periods and if these chillers fail, the building will become uninhabitable in local temperatures that regularly exceed 120 degrees in the hot season. ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 6 Months from Funding Date ¶I. Property Name: Building C (GSO Building) ¶J. Property ID: X-3001 ¶K. Property Type: G.O. ¶L. Assumptions: a) No Internal Floor Space Impacted b) No Impact on Installed Fire Protection System c) Project Duration: 8 months (2 mos fabrication; 4 mos shipping; 2 mos installation) d) U.S. Mate
rials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated Completion Cost: 258,257.00 USD ¶N. Source of Estimate: Vendor and Post Staff ¶O. Submitted by: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES ¶2. (U) ¶A. Niamey, Niger ¶B. Replace Chancery Building Chillers ¶C. Description of Project: Purchase, ship, and install two (2) new 380v, 50Hz, 60 ton chillers to replace the 20 year old units presently at post. ¶D. Post Rating: Critical ¶E. Special Considerations: a) Controlled Access Area? NO b) Construction Security Plan Required? NO c) Fire/Life Safety Issue? NO d) Hazardous Material Issues? NO e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? NO ¶F. Justification: New parts are no longer available for this chiller, which provides cooling to critical areas of the Embassy, including the Executive Offices, DAO Offices, RSO Offices, phone switch and data server rooms, and security system interface cabinet (SIC) room. Neither of the two chillers has sufficient individual capacity to cool the building during the high heat load periods and if these chillers fail the building will become uninhabitable in local temperatures that regularly exceed 120 degrees in the hot season. ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 6 Months from Funding Date ¶I. Property Name: Building A (Chancery Building) ¶J. Property ID: X-1001 ¶K. Property Type: G.O. ¶L. Assumptions: a) No Internal Floor Space Impacted b) No Impact on Installed Fire Protection System c) Project Duration: 8 months (2 mos fabrication; 4 mos shipping; 2 mos installation) d) U.S. Materials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated completion cost: 258,257.00 USD ¶N. Source of Estimate: Vendor and Post Staff ¶O. Submitted by: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES ¶3. (U) ¶A. Niamey, Niger ¶B. Replace 18 Year Old Residential Generators ¶C. Description of Project: Purchase, ship, and install fourteen (14) new 380v, 50Hz, 45kva generators to replace the 18 year old units presently at post. ¶D. Post Rating: Critical ¶E. Special Considerations: a) Controlled Access Area? NO b) Construction Security Plan Required? NO c) Fire/Life Safety Issue? NO d) Hazardous Material Issues? NO e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? NO ¶F. Justification: New parts are no longer available for these generators, which provide power for our American Officer residences. Reconditioned used parts are now being ordered and the generators have exceeded their life expectancy. Niamey suffers from continual blackouts and brownouts and residences are on generator power for hours and sometimes days at a time. The environment of Niamey is very harsh and degrades the reliability and longevity of all post equipment, particularly the generators. The lack of generator power and resulting loss of security lighting and alarm systems also increases the security threat as post has experienced break-ins to STL property and theft. ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 6 Months from Funding Date ¶I. Property Name: Listed Short Term Lease Residences ¶J. Property ID: Various ¶K. Property Type: S.T.L. ¶L. Assumptions: a) No Internal Floor Space Impacted b) No Impact on Installed Fire Protection System c) Project Duration: 6 months (2 mos fabrication & testing; 4 mos shipping; 1 week installation) based on equipment availability d) Local Installation Materials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated Completion Cost: 291,774.00 USD ¶N. Source of Estimate: Post Staff ¶O. Submitted by: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES ¶4. (U) ¶A. Niamey, Niger ¶B. GSO Building Sewer Separator Tank Installation ¶C. Description of Project: Install a three-stage septic tank system on the GSO building sewer system. ¶D. Post Rating: Urgent ¶E. Special Considerations: a) Controlled Access Area? NO b) Construction Security Plan Required? NO c) Fire/Life Safety Issue? YES d) Hazardous Material Issues? YES e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? NO ¶F. Justification: The current two-stage septic tank system is too small and was installed incorrectly, causing sewer solids to overflow into the cesspool tank and run onto the Chancery grounds. This presents a bio-hazard from e-coli as well as creating an issue with sewer smell in the front of the Embassy. This is an existing safety-related request on the Non-Capital Project Requirements list (ID UP-7729). ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 3 Months from Funding Date ¶I. Property Name: Building C (GSO Building) ¶J. Property ID: X-3001 ¶K. Property Type: G.O. ¶L. Assumptions: a) No Internal Floor Space Impacted b) No Impact on Installed Fire Protection System c) Project Duration: 3 months d) Local Materials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated Construction cost: 30,000 USD ¶N. Source of Estimate: Post Staff ¶O. Submitted By: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES ¶5. (U) ¶A. Niamey, Niger ¶B. Chancery Building Sewage Three-Stage Separator Tank System and Leach Field Sewer Installation ¶C. Description of Project: Install a new three-stage separator tank system and a leach field on the discharge of the Chancery sewer system to distribute effluent and allow it to enter the ground safely. ¶D. Post Rating: Urgent ¶E. Special Considerations: a) Controlled Access Area? NO b) Construction Security Plan Required? NO c) Fire/Life Safety Issue? YES d) Hazardous Material Issues? YES e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? NO ¶F. Justification: The current two-stage separator tank and cesspool tank has collapsed partially, causing sewer effluent to overflow the tanks and run onto the Chancery grounds. This presents a bio-hazard from e-coli as well as creating an issue with sewer smell in the front of the Embassy. The separator tanks were identified as inadequate this year, but the leach field system is an existing safety-related request on the Non-Capital Project Requirements list (ID UP-7730). The cost was modified to reflect the additional scope of work. ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 3 Months from Funding Date ¶I. Property Name: Chancery ¶J. Property ID: X-1001 ¶K. Property Type: LTL ¶L. Assumptions: a) No Internal Floor Space Impacted b) No Impact on Installed Fire Protection System c) Project Duration: 3 months d) Local Materials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated Construction cost: 50,000 USD ¶N. Source of Estimate: Post Staff ¶O. Submitted By: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES ¶6. (U) ¶A. Niamey, Niger ¶B. Chancery Building Electrical Service Replacement ¶C. Description of Project: Purchase and install a new primary electrical service from the incoming utility to the Chancery automatic transfer switch. Project will include new cable and conduit, a new primary distribution switchboard, and new circuit breakers to meet National Electrical Code. ¶D. Post Rating: Urgent ¶E. Special Considerations: a) Controlled Access Area? NO b) Construction Security Plan Required? NO c) Fire/Life Safety Issue? YES d) Hazardous Material Issues? NO e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? ON SERVICE TRANSITION ¶F. Justification: The current service does not meet code, is mismatched and undersized, and presents a very real danger of fire, electrocution, and interruption of Embassy operations. The primary distribution panel is a wood and metal box with exposed breakers mounted on locally-fabricated DIN rail and cable connections mounted to a wooden back-plane. Cables change size frequently from the service entrance to the distribution panel with connections in non-secure locally-fabricated boxes. The main distribution panel for the Chancery is a partially cannibalized fuse panel installed circa 1968 and the service transitions from the service entrance to the main distribution panel through thin wall PVC conduit across an exposed roof of the Chancery Annex building. ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 9 Months from Funding Date (2 months permitting and purchasing; 4 months shipping; 3 months installation) ¶I. Property Name: Chancery ¶J. Property ID: X-1001 ¶K. Property Type: G.O. ¶L. Assumptions: a) No Internal Floor Space Impacted b) No Impact on Installed Fire Protection System c) Project Duration: 9 months d) U.S. Materials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated Construction cost: 165,500.00 USD ¶N. Source of Estimate: Vendor and Post Staff ¶O. Submitted By: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES ¶7. (U) ¶A. Niamey, Niger ¶B. IPC Electrical Service Replacement ¶C. Description of Project: Purchase and install a new primary electrical service from the Chancery distribution panel to the IPC automatic transfer switch. Project will include new cable and conduit, a new Chancery distribution switchboard, and new circuit breakers to meet National Electrical Code. ¶D. Post Rating: Urgent ¶E. Special Considerations: a) Controlled Access Area? YES b) Construction Security Plan Required? YES c) Fire/Life Safety Issue? YES d) Hazardous Material Issues? NO e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? NO ¶F. Justification: The current service does not meet code, is a security risk, and presents a very real danger of fire, electrocution, and interruption of Embassy operations. The Chancery distribution panel is an old Westinghouse panel with mis-matched breakers, some of French manufacture. The cable feed from the panel to the IPC ATS is only partially in conduit and makes part of the route as open multi-conductor cable mounted less than 8 feet above the floor and attached to the supports of a garage roof. The cable run is outside the secure perimeter of the building and is in danger of damage by traffic in the area, which is used as storage. ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 9 Months from Funding Date (2 months permitting and purchasing; 4 months shipping; 3 months installation) ¶I. Property Name: Chancery ¶J. Property ID: X-1001 ¶K. Property Type: G.O. ¶L. Assumptions: a) No Internal Floor Space Impacted b) No Impact on Installed Fire Protection System c) Project Duration: 9 months d) U.S. Materials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated Construction cost: 36,000.00 USD ¶N. Source of Estimate: Vendor and Post Staff ¶O. Submitted By: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES ¶8. (U) ¶A. Niamey, Niger ¶B. Chancery Annex Flood Drainage ¶C. Description of Project: Install a drainage system from the rear of the Embassy, across the property to a lower grade at the front of the Embassy. This will be 12-inch PVC pipe installed underground and routed beneath the security wall of the Embassy to empty into a storm drain pit at the front of the Embassy and outside the security wall. Project includes purchase and installation of the piping as well as fabrication and installation of the storm drain pit. ¶D. Post Rating: Urgent ¶E. Special Considerations: a) Controlled Access Area? NO b) Construction Security Plan Required? NO c) Fire/Life Safety Issue? YES d) Hazardous Material Issues? NO e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? NO ¶F. Justification: The rear of the Embassy floods every year when the monsoon rains arrive. This flooding often covers the work areas for the motor pool with a foot of water and threatens the Chancery Annex, which houses the Health Unit. In addition, the flooding fills the GSO building generator room and enters the GSO building basement through the electrical service conduits. This presents a significant electrocution hazard for the Facility Management and Security staff as well as damaging equipment and systems each year. ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 8 Months from Funding Date (1 month purchasing; 4 months shipping; 3 months installation) ¶I. Property Name: Embassy Grounds ¶J. Property ID: X-1000 ¶K. Property Type: G.O. ¶L. Assumptions: a) No Internal Floor Space Impacted b) No Impact on Installed Fire Protection System c) Project Duration: 8 months d) U.S. Materials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated Construction cost: 40,000.00 USD ¶N. Source of Estimate: Post Staff ¶O. Submitted By: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES ¶9. (U) ¶A. Niamey, Niger ¶B. Consular Renovation Project ¶C. Description of Project: Expand the Consular Section to allow for additional workspace. Space limitations and the current configuration hamper operational efficiency. There no is controlled workspace for the collection of consular fees. The recent OIG report of inspection (ref B) highlighted problem areas and working with the Facility Manager, determined that the project could be done at modest cost. The light consular load at post would not require a fully detailed A&E project that meets current security and OBO consular standards, yet would satisfy the existing limitations. ¶D. Post Rating: Urgent ¶E. Special Considerations: a) Controlled Access Area? NO b) Construction Security Plan Required? NO c) Fire/Life Safety Issue? YES d) Hazardous Material Issues? NO e) Post is Capable of Managing Project? YES f) Space Planning Needed? NO g) Swing Space Needed? NO h) Asbestos Issues? NO i) Security Issues? NO ¶F. Justification: The work flow of the Consular Section is inefficient and the staff works in cramped office space. The enlarging of the space through non-load bearing wall removal and relocation will correct 90% of the problems currently experienced in the office. The absence of a teller window for consular fees also reduces accountability. There also is no privacy between the consular officer and applicants because of the limited space. ¶G. Planned Start Date: When Funded ¶H. Planned Completion Date: 200 Days from Funding Date (3 months purchasing; 2 months shipping; 2 months installation) ¶I. Property Name: Embassy Grounds ¶J. Property ID: X-1000 ¶K. Property Type: G.O. ¶L. Assumptions: a) Internal Floor Space Reconfigured and Expanded into Existing Conference Room. b) No Impact on Installed Fire Protection System c) Project Duration: 8 months d) U.S. Materials will be Used e) Local Labor will be Used f) No Local Permits Required ¶M. Estimated Construction cost: 25,000.00 USD ¶N. Source of Estimate: Post Staff ¶O. Submitted By: FM ¶P. Approved by SRPM? YES ¶Q. Cleared by RSO? YES ¶R. Cleared by POSHO? YES Allen