Identifier
Created
Classification
Origin
09GENEVA466
2009-06-12 13:04:00
SECRET
US Mission Geneva
Cable title:  

JCIC-XXXIV: U.S. DELEGATION PAPER DATED JUNE 9,

Tags:  KACT PARM START JCIC INF US RS UP BO KZ 
pdf how-to read a cable
VZCZCXYZ0007
OO RUEHWEB

DE RUEHGV #0466/01 1631304
ZNY SSSSS ZZH
O 121304Z JUN 09
FM USMISSION GENEVA
TO RUEHC/SECSTATE WASHDC IMMEDIATE 8624
RUEAIIA/CIA WASHINGTON DC IMMEDIATE
RUEKDIA/DIA WASHINGTON DC IMMEDIATE
RUEKJCS/JOINT STAFF WASHINGTON DC IMMEDIATE
RHEHNSC/NATIONAL SECURITY COUNCIL WASHINGTON DC IMMEDIATE
RUEKJCS/SECDEF WASHINGTON DC IMMEDIATE
RUEHNO/USMISSION USNATO IMMEDIATE 4572
RHMFISS/DEPT OF ENERGY WASHINGTON DC IMMEDIATE
RHMFISS/DTRA ALEX WASHINGTON DC IMMEDIATE
RUESDT/DTRA-OSES DARMSTADT GE IMMEDIATE
RUENAAA/CNO WASHINGTON DC IMMEDIATE
RHMFISS/DIRSSP WASHINGTON DC IMMEDIATE
INFO RUEHTA/AMEMBASSY ASTANA PRIORITY 1737
RUEHKV/AMEMBASSY KYIV PRIORITY 0745
RUEHMO/AMEMBASSY MOSCOW PRIORITY 5913
S E C R E T GENEVA 000466 

SIPDIS

DEPT FOR T, VCI AND EUR/PRA
DOE FOR NNSA/NA-24
CIA FOR WINPAC
JCS FOR J5/DDGSA
SECDEF FOR OSD(P)/STRATCAP
NAVY FOR CNO-N5JA AND DIRSSP
AIRFORCE FOR HQ USAF/ASX AND ASXP
DTRA FOR OP-OS OP-OSA AND DIRECTOR
NSC FOR LOOK
DIA FOR LEA

E.O. 12958: DECL: 06/12/2019
TAGS: KACT PARM START JCIC INF US RS UP BO KZ
SUBJECT: JCIC-XXXIV: U.S. DELEGATION PAPER DATED JUNE 9,
2009, "U.S. RESPONSE TO RUSSIAN AIDE-MEMOIRE DATED MARCH
10, 2009"

Classified By: Jerry A. Taylor, United States Representative
to the Joint Compliance and Inspection Commission.
Reasons: 1.4(b) and (d).

S E C R E T GENEVA 000466 SIPDIS DEPT FOR T, VCI AND EUR/PRA DOE FOR NNSA/NA-24 CIA FOR WINPAC JCS FOR J5/DDGSA SECDEF FOR OSD(P)/STRATCAP NAVY FOR CNO-N5JA AND DIRSSP AIRFORCE FOR HQ USAF/ASX AND ASXP DTRA FOR OP-OS OP-OSA AND DIRECTOR NSC FOR LOOK DIA FOR LEA E.O. 12958: DECL: 06/12/2019 TAGS: KACT PARM START JCIC INF US RS UP BO KZ SUBJECT: JCIC-XXXIV: U.S. DELEGATION PAPER DATED JUNE 9, 2009, "U.S. RESPONSE TO RUSSIAN AIDE-MEMOIRE DATED MARCH 10, 2009" Classified By: Jerry A. Taylor, United States Representative to the Joint Compliance and Inspection Commission. Reasons: 1.4(b) and (d). ¶1. (U) This is JCIC-XXXIV-015. ¶2. (U) At paragraph 3 is the text of the U.S. Delegation Paper entitled "U.S. Response to Russian Aide-Memoire dated March 10, 2009" that was provided to the Russian Delegation at the Heads of Delegation Meeting on Courtland Missile Assembly Facility and RS-24 New Type, held at the U.S. Mission, on June 10, 2009. ¶3. (S) Begin text: JCIC XXXIV U.S. Delegation Paper June 9, 2009 U.S. Response to Russian Aide-Memoire Dated March 10, 2009 The United States has studied the discussions from JCIC-XXXIII and the Russian aide-memoire dated March 10, 2009 and believes solutions exist for all four of the issues raised in the aide-memoire. Three of the issues will be addressed in this delegation paper. The U.S. response to the fourth issue, conversion of the B-1 heavy bomber to a heavy bomber equipped for non-nuclear armaments is the subject of a separate paper and has been provided in capitals. On the demonstration of the Minuteman III ICBM front section, the United States has determined that it can support such a request by the other Parties. A one-time demonstration will be organized and conducted outside of any inspection quotas established in the Treaty. We will inform you of the date through Diplomatic channels. On U.S. activities at the Courtland Missile Assembly Facility, the United States confirms that activities conducted at the Courtland Missile Assembly Facility are in compliance with Treaty requirements. Trident I SLBM first stage motors are brought to the Courtland facility to undergo activities that are consistent with work done at production facilities, including assembly of Trident I SLBM first stages. Trident I SLBM first stages assembled at the Courtland facility will be incorporated into LV-2 space launch vehicles, which will begin exiting the Courtland facility in the near future. The LV-2 space launch vehicle will initially be used as a target vehicle for testing of the U.S. ballistic missile defense system and other uses consistent with the START Treaty are possible. These space launch vehicles will be accountable under the START Treaty as Trident I SLBMs because, in the case of a Trident I SLBM, it is the first stage that is the item of accountability in accordance with Article III, paragraph 3(a). All required Treaty notifications will be provided and launch of the space launch vehicle will occur from facilities declared under the START Treaty. LV-2 technical information required by Joint Statements 21 and 31 was provided to the other parties in April 2009. With regard to the Russian Federation question on what Russian inspectors should do if this item is encountered, Russian inspectors will account for it as a Trident I first stage. On the re-declaration of Peacekeeper ICBM silo launchers as Minuteman III ICBM silo launchers, a START format 143 notification was transmitted June 4, 2009 that rescinded this re-declaration. The United States will provide the appropriate information in the next six-month update to the Memorandum of Understanding and considers this issue to be resolved. End text. ¶4. (U) Taylor sends. STORELLA

Share this cable

 facebook -  bluesky -