Identifier
Created
Classification
Origin
09BERLIN1130
2009-09-11 16:21:00
CONFIDENTIAL
Embassy Berlin
Cable title:  

GERMAN OPTICAL SATELLITE REMOTE SENSING: THE PATH FORWARD

Tags:  ETTC PGOV PINR MCAP PREL TSPA IT KS FR GM 
pdf how-to read a cable
VZCZCXRO3711
PP RUEHDH RUEHHM RUEHPB RUEHSL RUEHTM RUEHTRO
DE RUEHRL #1130/01 2541621
ZNY CCCCC ZZH
P 111621Z SEP 09
FM AMEMBASSY BERLIN
TO RUEHC/SECSTATE WASHDC PRIORITY 5176
INFO RUEHZN/ENVIRONMENT SCIENCE AND TECHNOLOGY COLLECTIVE
RUCNFRG/FRG COLLECTIVE
RUEHFR/AMEMBASSY PARIS 0734
RUEHRO/AMEMBASSY ROME 2259
RUEHUL/AMEMBASSY SEOUL 0583
RUEHNO/USMISSION USNATO 1265
RUEKJCS/HQ USEUCOM LO WASHINGTON DC
RUEKJCS/SECDEF WASHINGTON DC
RUEHRL/USDAO BERLIN GE
RUEHBS/USEU BRUSSELS
RUCUSTR/USSTRATCOM OFFUTT AFB NE
C O N F I D E N T I A L SECTION 01 OF 03 BERLIN 001130 

SIPDIS
STATE FOR EUR/CE PETER SCHROEDER
STATE FOR ISN/MDSP DICK BUENNEKE

E.O. 12958: DECL: 09/11/2034
TAGS: ETTC, PGOV, PINR, MCAP, PREL, TSPA, IT, KS, FR, GM
SUBJECT: GERMAN OPTICAL SATELLITE REMOTE SENSING: THE PATH
FORWARD

REF: A. BERLIN 1116
B. BERLIN 1080
C. BERLIN 1049
D. BERLIN 765
E. BERLIN 601
F. BERLIN 561
G. BERLIN 181
H. 08 BERLIN 1575

Classified By: Global Affairs Unit Chief Don L. Brown for
reasons 1.4 (b) and (d).

C O N F I D E N T I A L SECTION 01 OF 03 BERLIN 001130



SIPDIS

STATE FOR EUR/CE PETER SCHROEDER

STATE FOR ISN/MDSP DICK BUENNEKE



E.O. 12958: DECL: 09/11/2034

TAGS: ETTC, PGOV, PINR, MCAP, PREL, TSPA, IT, KS, FR, GM

SUBJECT: GERMAN OPTICAL SATELLITE REMOTE SENSING: THE PATH

FORWARD



REF: A. BERLIN 1116

B. BERLIN 1080

C. BERLIN 1049

D. BERLIN 765

E. BERLIN 601

F. BERLIN 561

G. BERLIN 181

H. 08 BERLIN 1575



Classified By: Global Affairs Unit Chief Don L. Brown for

reasons 1.4 (b) and (d).



1. (C) SUMMARY: The German Space Agency (DLR) is continuing

on its aggressive path to fly a High Resolution Optical

Satellite (HiROS) imaging system by 2013, despite an

uncertain funding future and an apparent lack of political

consensus in the current Grand-Coalition government. If the

CDU/CSU Union can forge a new coalition with the Free

Democratic Party (FDP) this September, support for HiROS will

likely solidify. In the meantime, DLR is taking prudent

steps to ensure HiROS technical requirements have been met.

END SUMMARY



2. (SBU) EconOff accompanied NGA representatives to meet

with DLR representatives at their Adlershof facility in

Berlin to discuss the future of the German HiROS program.

DLR was represented by Dr. Andreas Eckardt, Adlershof Head of

Optical Sensors and Electronics, and Mr. Frank Lehmann, Head

of Sensor Concepts and Applications at the Institute of

Robotics and Mechatronics.





DLR STILL LOOKING FOR HIROS FUNDING

--------------



3. (C) Eckardt opened the meeting saying, "We are currently

looking for financial support from Germany on HiROS." He

said that, in order for HiROS to proceed to Phase C and start

the procurement process, they will need secured funding;

until then, &in reality HiROS is not even an official

project.8 Eckardt said DLR is hopeful that upon

demonstrating technical feasibility and pending the outcome

of the German general elections this September, HiROS will

glide into Phases C and D in 2010 and be deployable in 2013.

(COMMENT: Concurrent with this meeting, Eckardt was briefing

"German officials" in another room on the HiROS Phase B

progress - presumably in an effort to secure government

funding/support. END COMMENT)






DLR IS CONFIDENT ABOUT THEIR EO TECHNOLOGY

--------------



4. (C) DLR's plans for HiROS go beyond establishing a remote

sensing competency to complement their

Synthetic-Aperture-Radar (SAR) programs. They plan to become

world leaders in commercial space-based Electro-Optical (EO)

imagery, while incorporating infra-red imaging capabilities.

Eckardt said although the planned Ground Resolved Distance

(GRD) for HiROS is 50 cm, DLR believes they have the

technology in hand to go down to 25-40 cm. The decision to

go with a 50 cm GRD is motivated by the desire to export

HiROS data while avoiding export control restrictions.



5. (C) Eckardt said HiROS will incorporate two thermal

sensors: one 5-6 meter GRD long-wave sensor, and a 4-5 meter

GRD mid-wave sensor. Eckardt admitted that DLR is conducting

classified research into the possibility of building a

three-meter aperture telescope mirror that would not be made

of silicon carbide, but of a "brand new material" (NFI).

(COMMENT: Eckardt seemed to suggest that HiROS is part of a

larger, long-term German plan to secure technical dominance

in the worldwide space-based EO arena. END COMMENT)



6. (C) Eckardt described DLR's responsibilities for the

HiROS proposal as constructing the HiROS instruments,

sensors, and focal plane as well as the ground segment. In

addition, DLR would develop mission software and image

processing algorithms. German industry would be responsible



BERLIN 00001130 002 OF 003





for building the spacecraft bus and other mission segments,

where both Astrium (Friedrichshafen) and OHB-System would

have roles. Eckardt said Jena Optronik would provide new

star-tracking cameras for HiROS for improved control and

accuracy.





DLR CONCERNED ABOUT ITAR RESTRICTIONS WITH US COMPONENTS

-------------- --------------



7. (C) Eckardt said DLR would like to procure US-origin

control motion gyroscopes (CMGs) and radiation-hardened

integrated circuits (ICs) from US vendors, but is concerned

that ITAR restrictions would inject too much procurement risk

into the HiROS proposal. Eckardt mentioned the US companies

Northrop Grumman (CMGs) and Fairchild Semiconductor (ICs)

specifically as desirable sources of HiROS components.

Eckardt said if ITAR restrictions appear too problematic,

they would likely turn to French suppliers. Eckardt

emphasized that this was not his preference because, "as a

scientist, I just want the best components."





DLR'S KOREAN CONNECTION FUELING HIROS R&D

--------------



8. (C) DLR's motivation to develop HiROS emerged from a 2006

partnership with the Korean Aerospace Research Institute

(KARI),where DLR provided sensors, collection instruments,

and other mission critical equipment (effectively everything

except for the satellite bus) for KARI's KOMPSAT-3 a

high-resolution lightweight earth observation satellite.

This partnership, in cooperation with German industry at

Astrium in Friedrichshafen and Jena Optronik, essentially

funded DLR's HiROS research and development. Eckardt said

DLR is already working on instruments for the next generation

KARI earth-observation satellites, KOMPSAT-6 and -7, with a

planned EO GRD of 25 cm.





DLR CALLS KARI A GOOD FRIEND, BUT WARY OF TECHNOLOGY LEAKS

-------------- --------------



9. (C) Eckardt spoke glowingly of DLR's cooperation with

KARI and called the director of KARI's Satellite Office,

Joo-Jin Lee, "a good friend." Eckardt said DLR's cooperation

with KARI has progressed to the point where scientific

exchange is under way with two KARI scientists working

full-time at DLR's Berlin-Adlershof facility. Eckardt,

pausing for a moment while describing this relationship,

emphasized that DLR considers the area where KARI officials

are working to be "older technology" and would not pose an

"unauthorized technology transfer risk." He added, "we are

being careful to keep all the cutting edge technologies to

ourselves."





DIGITAL GLOBE TAKING A WAIT-AND-SEE APPROACH WITH HIROS

-------------- --------------



10. (C) Digital Globe (DG) CEO, Dr. Walter Scott, confirmed

DG's participation in DLR's Phase B technical feasibility

study, but further participation in HiROS is contingent on

obstacles that DLR must overcome. The technical questions

Scott said DG needs answered are: (1) will HiROS have

suitable technical performance for DG's needs and (2) what

will the HiROS concept of operations look like in terms of

the licensing regime. Scott also said DLR would need to

demonstrate adequate financial/political support from the

German government for HiROS. Scott said if DLR can alleviate

these concerns, the next step would be negotiations on the

economic terms under which DG would acquire capacity in the

HiROS system.



11. (C) Scott sees DG involvement with HiROS as a win/win

situation for DLR and DG, as well as for the German and US

governments. Scott said DG would primarily gain imaging

capacity and revisit rate, while Germany would potentially

gain access to the US market, a funding partner, and an



BERLIN 00001130 003 OF 003





additional means of technical risk reduction. Scott feels

from the USG remote sensing perspective, HiROS would mitigate

risk against having yet another capable foreign competitor

emerge.





COMMENT

--------------



12. (C) With the German general election approaching

quickly, HiROS's prospects will likely appear clearer by the

end of the year. While technical considerations do not

appear problematic, political/financial concerns seem to be

the main hurdle ahead for HiROS viability. In 2006, France

and Germany merged their space programs with a gentleman's

agreement not to step on each other,s turf--the Germans

would handle SAR and the French EO. However, the French have

since then partnered with the Italians, who have their own

indigenous space-based SAR -- COSMOS-SKYMED, and are

leveraging this relationship to market their EO commercial

system packaged with COSMOS-SKYMED to worldwide governments.

These moves do not sit well with either German commercial

space-radar vendors or DLR. HiROS could offer them an

offsetting opportunity.

Murphy

Share this cable

 facebook -  bluesky -