KAZAKHSTAN: GAS PRODUCTION AND TRANSPORTATION UPDATE

Tags:  PGOV ECON EPET EINV KZ 
pdf how-to read a cable
VZCZCXRO7542
OO RUEHAG RUEHAST RUEHBI RUEHCI RUEHDA RUEHDBU RUEHDF RUEHFL RUEHIK
RUEHKW RUEHLA RUEHLH RUEHLN RUEHLZ RUEHNEH RUEHNP RUEHPOD RUEHPW
RUEHROV RUEHSK RUEHSL RUEHSR RUEHVK RUEHYG
DE RUEHTA #1187/01 1960456
ZNR UUUUU ZZH
O 150456Z JUL 09
FM AMEMBASSY ASTANA
TO RUEHC/SECSTATE WASHDC IMMEDIATE 5803
INFO RUCNCIS/CIS COLLECTIVE 1757
RUCNCLS/ALL SOUTH AND CENTRAL ASIA COLLECTIVE
RUEHZL/EUROPEAN POLITICAL COLLECTIVE
RUEHBJ/AMEMBASSY BEIJING 1124
RUEHKO/AMEMBASSY TOKYO 1826
RUEHUL/AMEMBASSY SEOUL 0785
RHEBAAA/DEPT OF ENERGY WASHINGTON DC
RUCPDOC/DEPT OF COMMERCE WASHINGTON DC
RUEATRS/DEPT OF TREASURY WASHINGTON DC
RUEAIIA/CIA WASHINGTON DC
RUEKDIA/DIA WASHINGTON DC
RHEHNSC/NSC WASHDC 1308
RUEKJCS/SECDEF WASHDC 1225
RUEKJCS/JOINT STAFF WASHDC
RHMFIUU/CDR USCENTCOM MACDILL AFB FL
UNCLAS SECTION 01 OF 02 ASTANA 001187 

SENSITIVE
SIPDIS

STATE FOR SCA/CEN, EEB
STATE PLEASE PASS TO USTDA

E.O. 12958: N/A
TAGS: PGOV ECON EPET EINV KZ
SUBJECT: KAZAKHSTAN: GAS PRODUCTION AND TRANSPORTATION UPDATE

REF: (A) ASTANA 0862
(B) ASTANA 0166

UNCLAS SECTION 01 OF 02 ASTANA 001187 SENSITIVE SIPDIS STATE FOR SCA/CEN, EEB STATE PLEASE PASS TO USTDA E.O. 12958: N/A TAGS: PGOV ECON EPET EINV KZ SUBJECT: KAZAKHSTAN: GAS PRODUCTION AND TRANSPORTATION UPDATE REF: (A) ASTANA 0862 (B) ASTANA 0166 ¶1. (U) Sensitive but unclassified. Not for public Internet. ¶2. (SBU) SUMMARY: Officials from the Ministry of Energy and Mineral Resources and national oil company KazMunaiGas recently briefed Energy Officer on the latest natural gas production forecasts and pipeline projects. END SUMMARY. ABOUT 30 BCM PRODUCED IN 2008 ¶3. (SBU) According to the Managing Director for Gas Industry Development at KazMunaiGas (KMG),Mussabek Issayev, Kazakhstan has 3.3 trillion cubic meters of natural gas reserves and in 2008, produced 30 billion cubic meters (bcm) of gas. Approximately 12 bcm, or 40 percent of Kazakhstan's total production, was re-injected at the Karachaganak and Tengiz fields to maintain pressure for oil production. An additional 2.5 bcm was flared for technical reasons, while 11 bcm from the Karachaganak, Tolkyn, and Tengiz fields was exported. To meet domestic demand, Kazakhstan imports 1 bcm from Russia to supply its northern regions, and 3 bcm via swap operations with Uzbekistan to supply its southern regions. REINJECTION HINDERS GAS MARKET ¶4. (SBU) Issayev said he expects Kazakhstan to produce up to 100 bcm of natural gas by 2020. He anticipates that the Karachaganak, Tengiz, Zhanazhol, and Kashagan fields will be responsible for 92 percent of all natural gas production. Issayev also said he expects Tengizchevroil (TCO) to reinject 40 percent of Tengiz gas, Karachaganak Petroleum Operating B.V. (KPO) to reinject 40 percent of its gas, and the North Caspian Operating Company (NCOC) to reinject 80 percent of the gas produced at Kashagan. "As a result," said Issayev, "only 35 bcm will be for sale, of which 15-18 bcm will be consumed domestically, and 15-17 bcm will be exported." According to Issayev, KMG is studying alternatives to gas re-injection to maintain field pressure. "As the price of gas steadily increases, it is much more profitable to sell more gas and re-inject less," he said. Issayev hypothesized that carbon dioxide, nitrogen, and water could be used instead of gas to maintain pressure in the wells for oil production. THE KAZTRANSGAS MONOPOLY ¶5. (SBU) As reported in reftel B, KMG subsidiary KazTransGas (KTG) owns and operates all of the gas pipelines in Kazakhstan. KTG transpo
rts gas to export markets via subsidiaries such as Intergas Central Asia, which operates the Kazakhstani part of the Central Asia-Center gas pipeline, and Asian Gas Pipeline, a joint venture of KTG and the CNPC subsidiary that manages the Kazakhstan-China gas pipeline. KTG transports gas to domestic markets via regional subsidiaries such as KazTransGas-Aimak. Issayev told Energy Officer that "even though the Central Asia-Center gas pipeline was built 40 years ago, it still safely transits 45 bcm of Turkmen gas, 10 bcm of Uzbek gas, and about 5 bcm of Kazakhstani gas a year." CASPIAN LITTORAL GAS PIPELINE ¶6. (SBU) On December 22, 2007, Kazakhstan, Russia, and Turkmenistan signed an agreement to build the 1,600-kilometer (km) Caspian Littoral (Prikaspiskiy) Gas Pipeline, with a 20-bcm designed annual throughput capacity. Of the pipeline's 1,600 km length, only 10 km will be built by Russia, 795 km by Kazakhstan, and 795 km by Turkmenistan. According to an April 9 statement by Gazprom CEO Alexei Miller, the capacity of the Caspian Littoral pipeline might be increased by another 20 bcm. Kazakhstan will transit 10 bcm of Turkmen gas from Belek and export 10 bcm of its own gas via Beineu to Russia's Alexandrov Guy. According to Timur Imashev, Director of Gas Industry Development at the Ministry of Energy and Mineral Resources (MEMR),Kazakhstan will fill the pipeline with gas from Karachaganak and Tengiz, in addition to new offshore fields such as the N Block, Pearls, and Kashagan, if needed. He told Energy ASTANA 00001187 002 OF 002 Officer on June 8 that the project is expected to be completed in ¶2013. ¶7. (SBU) Imashev sees the Caspian Littoral pipeline as an extension and modernization of the existing Central Asia-Center gas pipeline and does not anticipate any technical difficulties with the project. However, he said that ongoing negotiations between Turkmenistan and Russia over the price of Turkmen gas might delay the launch of the project. Imashev expects that 30 bcm of gas will be supplied by Turkmenistan and up to 10 bcm by Kazakhstan. "Kazakhstan does not really care whether Turkmenistan has gas, or how much they have," he said. "We just want guarantees that they will pay the transit fee." KAZAKHSTAN-CHINA GAS PIPELINE ¶8. (SBU) A 1,300-km Kazakhstan-China gas pipeline with an annual capacity of 40 bcm will transit Turkmen gas to Uzbekistan's border with Kazakhstan, and then to the Chinese city of Khorgos. MEMR's Imashev told Energy Officer that 13 bcm a year would be supplied from a Turkmen gas deposit currently being developed by CNPC on the right bank of the Amu Darya River, and 17 bcm would be purchased by China from Turkmenistan. On July 10, Beimbet Shayakhmetov, Director General of the Asian Gas Pipeline company, announced that the first segment of the pipeline would be completed by November 2009. According to Shayakhmetov, the pipeline would only carry approximately 4.5 bcm a year, but it is expected to reach full capacity by late 2013. Once the pipeline is at full capacity, 30 bcm will be transported to China and 10 bcm will be used domestically. The Kazakhstan-China gas pipeline will consist of two parallel pipelines, with a diameter of 1,067 millimeters and a length of 1,304.5 kilometers. The main contractors of the project will be Kazakhstan's KazStroyService and China Petroleum Pipeline Engineering. BEINEU-BOZOI-AKBULAK ¶9. (SBU) The 1,510-km Beineu-Bozoi-Akbulak gas pipeline will connect the Central Asia-Center and Kazakhstan-China gas pipelines. KMG's Issayev told Energy Officer that the pipeline would not only help Kazakhstan secure gas for Kyzylorda, South Kazakhstan, Zhambyl, and Almaty oblasts, but also help the Chinese ship Kazakhstani gas from the CNPC-operated oil and gas fields in Aktobe and Mangistau oblasts. The Bozoi-Akbulak segment of the pipeline has a 5 bcm annual throughput capacity and was officially opened on January 22. Completion of the Beineu-Bozoi segment would increase the pipeline's capacity to 10 bcm and is expected to be completed when the second stage of the Kazakhstan-China gas pipeline comes on stream. ¶10. (SBU) MEMR's Imashev said that the Beineu-Bozoi-Akbulak pipeline would reduce dependence of the western regions of Kazakhstan on Uzbek gas obtained via swap operations. He complained that "Uzbekistan is problematic, as it often plays games." Imashev explained that Kazakhstan does not have a direct contract with Uzbekistan which would give Kazakhstan leverage to impose fines for breaching terms. "If we had a contract," he explained, "then Uzbekistan would increase the price from $80 to $300." HOAGLAND