Identifier
Created
Classification
Origin
08COTONOU151
2008-03-07 08:47:00
UNCLASSIFIED
Embassy Cotonou
Cable title:  

BENIN: COSTAL PROTECTION WORKS TO START - SEA POLLUTION

Tags:  ECON SENV EPET KMCA BN 
pdf how-to read a cable
VZCZCXRO8683
RR RUEHMA RUEHPA
DE RUEHCO #0151 0670847
ZNR UUUUU ZZH
R 070847Z MAR 08 ZDK
FM AMEMBASSY COTONOU
TO RUEHC/SECSTATE WASHDC 0227
INFO RUEHZK/ECOWAS COLLECTIVE
RUEHLMC/MILLENIUM CHALLENGE CORP WASHDC
RUEHFR/AMEMBASSY PARIS 1240
RUEHDK/AMEMBASSY DAKAR 1424
RUEHLO/AMEMBASSY LONDON 0326
RUEHUJA/AMEMBASSY ABUJA 0295
RUEHOS/AMCONSUL LAGOS 1295
RUEHNY/AMEMBASSY OSLO 0013
UNCLAS COTONOU 000151 

SIPDIS

SIPDIS

DEPT FOR AF/EPS, AF/W: BANKS, OES
ACCRA FOR REO JHUNT
LONDON AND PARIS FOR AFRICA WATCHERS

E.O. 12958: N/A
TAGS: ECON SENV EPET KMCA BN
SUBJECT: BENIN: COSTAL PROTECTION WORKS TO START - SEA POLLUTION
AROUND OFFSHORE OIL FIELD

REF: 07 COTONOU 763

---------------------------------
Coastal Protection Works Launched
---------------------------------

UNCLAS COTONOU 000151 SIPDIS SIPDIS DEPT FOR AF/EPS, AF/W: BANKS, OES ACCRA FOR REO JHUNT LONDON AND PARIS FOR AFRICA WATCHERS E.O. 12958: N/A TAGS: ECON SENV EPET KMCA BN SUBJECT: BENIN: COSTAL PROTECTION WORKS TO START - SEA POLLUTION AROUND OFFSHORE OIL FIELD REF: 07 COTONOU 763 -------------- Coastal Protection Works Launched -------------- ¶1. On February 26, 2008, President Boni Yayi officially launched construction of jetties which will fight coastal erosion along a 7.5 km stretch of eroding coastline located to the east of the Port of Cotonou (reftel). Francois Noudegbessi, the Minister of Urban Development, Land Reform and Coastal Erosion Prevention, stated that the construction of these jetties will help protect a number of buildings which could fall victim to the encroaching sea if erosion continued unabated. It will take 48 months to complete the work which will cost 32 billion FCFA (74 million USD) with financing coming from Gulf States' financial institutions. ¶2. As noted in reftel, these jetties are part of a coastal erosion protection plan based on a comprehensive engineering feasibility study completed by a group of Dutch experts. MCC and the engineering companies constructing the jetties are coordinating closely, as the coastal protection program complements the MCC-financed harbor dredging program. Dredge spoils from the MCC program will be used to bolster the shoreline between the jetties and offset the existing erosion. Comment: The two programs are a fantastic example of donor collaboration done right, as both programs benefit from the other. End Comment. -------------- Pollution from offshore oil fields -------------- ¶2. A source at the Ministry of Energy, Mines and Water informed the embassy that oil is seeping from improperly capped offshore oil wells located east of Cotonou, not far from Benin's maritime border with Nigeria. He said that floating oil was easily visible on the sea's surface around the abandoned oil platform. The Norwegian company SAGA-Petroleum abandoned the platform in 1998 after termination of the oil exploration compact it signed with the GOB. No mitigation efforts are underway presently though the GOB has approached the World Bank for assistance in funding the cleanup. According to the same source, the GOB signed a contract with a Nigeria based oil company to take over this oil field. The company does not plan on using the existing wells but will drill new ones instead. BROWN

Share this cable

 facebook -  bluesky -