Identifier
Created
Classification
Origin
08ASMARA79
2008-02-19 11:10:00
CONFIDENTIAL
Embassy Asmara
Cable title:  

WORLD BANK: PROGRAMS IN ERITREA

Tags:  ECON PREL ER 
pdf how-to read a cable
VZCZCXRO1255
RR RUEHROV
DE RUEHAE #0079 0501110
ZNY CCCCC ZZH
R 191110Z FEB 08
FM AMEMBASSY ASMARA
TO RUEHC/SECSTATE WASHDC 9448
INFO RUCNIAD/IGAD COLLECTIVE
RUEKDIA/DIA WASHDC
RUEAIIA/CIA WASHDC
RHEHNSC/NSC WASHDC
RUEKJCS/SECDEF WASHDC
RUEPADJ/CJTF-HOA J2X CAMP LEMONIER DJ
RUMICEA/JICCENT MACDILL AFB FL
RHMFISS/CDR USCENTCOM MACDILL AFB FL
C O N F I D E N T I A L ASMARA 000079 

SIPDIS

SIPDIS

DEPARTMENT FOR AF/E
LONDON AND PARIS FOR AFRICA WATCHER

E.O. 12958: DECL: 02/18/2018
TAGS: ECON PREL ER
SUBJECT: WORLD BANK: PROGRAMS IN ERITREA

Classified By: Ambassador Ronald K. McMullen for reason 1.4 (d)

C O N F I D E N T I A L ASMARA 000079 SIPDIS SIPDIS DEPARTMENT FOR AF/E LONDON AND PARIS FOR AFRICA WATCHER E.O. 12958: DECL: 02/18/2018 TAGS: ECON PREL ER SUBJECT: WORLD BANK: PROGRAMS IN ERITREA Classified By: Ambassador Ronald K. McMullen for reason 1.4 (d) ¶1. (SBU) Summary: Poloff met with visiting World Bank Economist Tracy Lane and Eritrean World Bank Country Director Chris Lovelace on February 14 to discuss FY2008 and proposed FY2009-2010 projects in Eritrea. Lane discussed two repeat projects, time tables, and costs, as well as the Bank's strategy for working with the Government of the State of Eritrea (GSE). She also sought Department assistance to influence the American Executive Director to support the Bank's plan. End Summary. ¶2. (SBU) Lane informed Poloff the World Bank's proposed assistance will not include good governance and transparency projects due to the GSE's complete lack of interest in macroeconomic reform. Instead, the Bank will pursue a pragmatic approach, stressing repeat projects directly helping Eritrean people and allowing the Bank to stay engaged in the country. In FY2008, twenty-five million dollars has been proposed to extend the national electrical grid to 21 additional villages and stock spare parts for diesel generators. (Note: This funding continues a World Bank project which has already connected 59 villages to the grid. End Note.) Twelve million dollars has been proposed to continue Integrated Childhood Development projects, which include education, health, and vaccination programs. The entire thirty-seven million must be allocated by June 2008 in order to avoid forfeiture; GSE stalling caused the delay, which has condensed a six-to-eight month process into four months. ¶3. (SBU) Future proposed projects for FY2009 through FY2010 include upgrading the national telecommunications infrastructure by laying fiber optic cable between Eritrean cities, with the GSE funding the international connection, presumably using ONE of the underwater Red Sea cables. Other World Bank projects include paying salaries for expatriate professors providing instruction at tertiary schools and installation of solar powered irrigation systems. ¶4. (SBU) Lane requested Department support in lobbying the American Executive Director of the World Bank to support their Eritrean strategy. She stressed that low risk/low return projects were the best way to maintain Bank engagement in Eritrea. Poloff informed Lane that the Embassy would relay her request to the Department. ¶5. (C) Comment: The GSE has proven a notoriously difficult partner in programs not included as priorities in its own national plans. Further, it will not support any donor-driven good governance or democracy program. The World Bank's low risk program approach seeks to maintain its presence during an extremely difficult political period while providing greatly needed assistance to a deprived and oppressed population. End Comment. MCMULLEN

Share this cable

 facebook -  bluesky -