Identifier
Created
Classification
Origin
06RABAT1091
2006-06-06 11:49:00
UNCLASSIFIED
Embassy Rabat
Cable title:  

TUNNELING UNDER: LINKING EUROPE AND AFRICA ACROSS

Tags:  ELTN EINV ECON MO 
pdf how-to read a cable
VZCZCXYZ0017
RR RUEHWEB

DE RUEHRB #1091 1571149
ZNR UUUUU ZZH
R 061149Z JUN 06
FM AMEMBASSY RABAT
TO RUEHC/SECSTATE WASHDC 3940
INFO RUEHCL/AMCONSUL CASABLANCA 1764
RUCPDOC/USDOC WASHDC
RULSDMK/DEPT OF TRANSPORTATION WASHDC
RUEHMD/AMEMBASSY MADRID 5523
RUEHAS/AMEMBASSY ALGIERS 4021
RUEHTU/AMEMBASSY TUNIS 8909
RUEHFR/AMEMBASSY PARIS 4232
RUEHNK/AMEMBASSY NOUAKCHOTT 3196
UNCLAS RABAT 001091 

SIPDIS

SIPDIS

DEPT FOR NEA/MAG AND EB/TRA
USDOC FOR ITA/MAC/ANESA NATE MASON

E.O. 12958: N/A
TAGS: ELTN EINV ECON MO
SUBJECT: TUNNELING UNDER: LINKING EUROPE AND AFRICA ACROSS
THE STRAIT OF GIBRALTAR

REF: RABAT 1029

UNCLAS RABAT 001091 SIPDIS SIPDIS DEPT FOR NEA/MAG AND EB/TRA USDOC FOR ITA/MAC/ANESA NATE MASON E.O. 12958: N/A TAGS: ELTN EINV ECON MO SUBJECT: TUNNELING UNDER: LINKING EUROPE AND AFRICA ACROSS THE STRAIT OF GIBRALTAR REF: RABAT 1029 ¶1. For decades, the governments of Morocco and Spain have been contemplating a way to connect Europe and Africa through a permanent land link across the Strait of Gibraltar. After a series of feasibility studies spanning more than a quarter century, a mixed Spanish-Moroccan commission determined that an undersea train tunnel similar to the France-England Chunnel would be the most practical option. Studies found that a suspension bridge would be four times as costly, could interfere with navigation in the strait, and would be harmful to migrating sea life. ¶2. The chosen route would link Paloma Point near Tarifa in Spain with the Moroccan Malabata Point, just east of Tangier, through a 37-km train tunnel. This route crosses the shallowest section of the strait, with a maximum depth of 300 meters. It is not feasible to run the tunnel between the two closest points of land - Cap Sires in Morocco and Punta Canales in Spain, a mere 14 km apart - because the ocean depth at that point reaches 900 meters. ¶3. The tunnel is expected to cost $5 billion and will be financed by Spain, Morocco and the EU, with the possible eventual participation by private enterprises. The two countries intend to launch a tender in 2007 or 2008 and complete the works in 2020. Trains would transport passengers, vehicles, and cargo between the two terminals in 30 minutes. The annual traffic capacity of the tunnel will be 1.6 million cars, 500,000 trucks, five million vehicle passengers and 11 million rail passengers. ¶4. COMMENT: Given the high volume of illicit traffic in persons and narcotics flowing between Morocco and Spain, legitimate concerns exist regarding the wisdom of facilitating the flow by tunneling under the strait. Spanish diplomats in Rabat seem unconcerned, but other European diplomats have privately expressed their skepticism to Emboffs regarding the wisdom of creating such a link. Either way, completion of the project is a long way off, and circumstances are like to change significantly in the meantime. RILEY

Share this cable

 facebook -  bluesky -