Identifier
Created
Classification
Origin
06DUSHANBE493
2006-03-14 13:55:00
UNCLASSIFIED//FOR OFFICIAL USE ONLY
Embassy Dushanbe
Cable title:  

TAJIKISTAN'S MOI WITH AES ON POWER TRANSMISSION LINES

Tags:  PGOV PREL ENRG ECON RS TI AF 
pdf how-to read a cable
VZCZCXRO8130
PP RUEHLN RUEHVK RUEHYG
DE RUEHDBU #0493/01 0731355
ZNR UUUUU ZZH
P 141355Z MAR 06
FM AMEMBASSY DUSHANBE
TO RUEHC/SECSTATE WASHDC PRIORITY 6965
INFO RUCNCIS/CIS COLLECTIVE
RUEAIIA/CIA WASHDC
RHEFDIA/DIA WASHINGTON DC
RHEHNSC/NSC WASHINGTON DC
RUEHAK/AMEMBASSY ANKARA PRIORITY 1443
RUEHBJ/AMEMBASSY BEIJING PRIORITY 1480
RUEHRL/AMEMBASSY BERLIN PRIORITY 1468
RUEHIL/AMEMBASSY ISLAMABAD PRIORITY 1424
RUEHBUL/AMEMBASSY KABUL PRIORITY 1370
RUEHLO/AMEMBASSY LONDON PRIORITY 1432
RUEHNE/AMEMBASSY NEW DELHI PRIORITY 1394
RUEHFR/AMEMBASSY PARIS PRIORITY 1322
RUEHKO/AMEMBASSY TOKYO PRIORITY 1239
RUEKJCS/SECDEF WASHINGTON DC
RHMFISS/HQ USCENTCOM MACDILL AFB FL
RHMFISS/HQ USEUCOM VAIHINGEN GE
RUCNDT/USMISSION USUN NEW YORK PRIORITY 1020
RUEHNO/USMISSION USNATO PRIORITY 1464
RUEHVEN/USMISSION USOSCE PRIORITY 1515
RUEHBS/USEU BRUSSELS PRIORITY 0813
RUEHDBU/AMEMBASSY DUSHANBE PRIORITY 8100
RUEHML/AMEMBASSY MANILA PRIORITY 0026
RHMFIUU/DEPT OF ENERGY WASHINGTON DC
RUCPDOC/DEPT OF COMMERCE WASHINGTON DC
RUEATRS/DEPT OF TREASURY WASHINGTON DC
UNCLAS SECTION 01 OF 03 DUSHANBE 000493 

SIPDIS

SENSITIVE
SIPDIS

STATE FOR SCA/CEN
EMBASSY MANILA: PLEASE PASS TO ADB AMBASSADOR SPELTZ

E.O. 12958: N/A
TAGS: PGOV PREL ENRG ECON RS TI AF
SUBJECT: TAJIKISTAN'S MOI WITH AES ON POWER TRANSMISSION LINES


DUSHANBE 00000493 001.2 OF 003


UNCLAS SECTION 01 OF 03 DUSHANBE 000493

SIPDIS

SENSITIVE
SIPDIS

STATE FOR SCA/CEN
EMBASSY MANILA: PLEASE PASS TO ADB AMBASSADOR SPELTZ

E.O. 12958: N/A
TAGS: PGOV PREL ENRG ECON RS TI AF
SUBJECT: TAJIKISTAN'S MOI WITH AES ON POWER TRANSMISSION LINES


DUSHANBE 00000493 001.2 OF 003



1. (SBU) SUMMARY: Post received the following letter from
the Minister of Energy regarding Tajik government cooperation
with AES, including the nine-page Memorandum of Intent for the
"construction of a 220kV transmission line connecting the energy
systems of Tajikistan and Afghanistan." The letter summarized
the events and negotiations of the preceding months and outlined
AES's requirements for participation in Tajikistan's energy
sector and a timeline for the project, scheduled to be completed
in November 2007. END SUMMARY


2. (SBU) COMMENT: If things move according to schedule, the
transmission lines will give AES the toehold in the Tajik energy
sector that eluded them as hydropower station projects went one
after another to other investors. Contacts in the Ministry of
Energy have always mentioned AES as the prime candidate to build
the transmission lines, but failed to understand AES's need to
control some power generation as well. We hope this agreement
will mark the first step towards AES participating in a power
station project, either Rogun, or another smaller project. END
COMMENT.


3. Begin text:

March 6

TO THE EMBASSY OF THE
UNITED STATES OF AMERICA

Herewith, we would like to inform you that beginning 2005 the
Ministry of Energy of Tajikistan and AES Silk Road (USA) held
intensive negotiations in the area of energy, in particular
construction and maintenance of energy facilities and
possibilities of export Tajik electricity to Islamic Republic of
Afghanistan and Islamic Republic of Pakistan.

In the course of series of negotiations proposals were reviewed
to construct a 500- or 765 kV transmission lines on following
routes: Roghun - Khorog - Vahang Corridor - Chirtal - Peshawar,
and Roghun - Sangtuda - Shirhon Bandar - Kunduz - Puli Humri -
Kobul Peshawar to enable future exports of electricity upon
completion of construction at Roghun, Sangtuda I and Sangtuda II
hydroelectric power stations.


As a result of activities a Memorandum of Intention was
signed between Open Joint Stock Holding Company "Barqi Tojik" of
the Ministry of Energy of Tajikistan and AES Nurenergoservice of
AES Silk Group in the area of collaboration of excess
electricity produced during summer period at hydroelectric power
stations in Tajikistan. Then, since December 2005 AES actively
participated in negotiations between the Ministry of Energy of
Tajikistan and the Ministry of Energy and Water Resources of
Islamic Republic of Afghanistan on collaboration in the energy
sector; negotiations discussed issues concerning implementation
of projects to build the aforementioned transmission lines.

Then, in January 16, 2006 the Government of Tajikistan
conducted a meeting to discuss Hydropower Development Strategy
and to create an international hydropower consortium. The
meeting was attended by representatives of the Government of
Tajikistan, RAO UES, Rusal JSC, Kazakhstan Development Bank,
Kazakhstan Investment Fund, Asian Development Bank and European
Bank for Reconstruction and Development.

A Protocol of Second International Meeting was signed in a

DUSHANBE 00000493 002.2 OF 003


course of the meeting to establish an international hydropower
consortium; in accordance with Protocol AES committed to be an
investment partner for construction of electric transmission
lines and to export electricity to Afghanistan and Pakistan
under the following conditions:

--Financial support from IFIs
--Government of Tajikistan as one of the partners
--Commercial purchase agreement with Afghanistan and Pakistan,
as future consumers of Tajik electricity
--Partnership with companies for the Russian Federation
--Intention to play a key role in development, design,
construction and management of transmission lines and generating
facilities
--Expresses interest to actively work with the Government of
Tajikistan and IFI in implementation of a project 220 kV
Transmission Line (construction of 220 kV two-circuit
transmission line Sangtuda - Geran - Sherhon Bandar - Kunduz to
export electricity to Afghanistan).

With a purpose to implement commitments within the framework of
mentioned above Protocol, AES presented a draft of Memorandum of
Intent between Ministry of Energy of Tajikistan and AES Silk
Road Inc for construction of a 220 kV transmission line
connecting energy systems of Tajikistan and Afghanistan. This
Memorandum was reviewed by us and with amended changes was
forward to AES office in Almaty on February 28, 2006.

Based on said above, Ministry of Energy is forwarding for your
information a copy of the draft Memorandum of Intent between
Ministry of Energy of Tajikistan and AES Silk Road Inc. for
construction of a 220 kV transmission line connecting energy
systems of Tajikistan and Afghanistan.

We request your assistance in implementation of the
project.

Attachment: 9 pages

Sincerely,

Minister J. Nurmahmatov

End text



4. Following are the Memorandum of Intent's main points. A
complete text is available in Russian.

MEMORANDUM OF INTENT

Preamble:

Parties to Memorandum: Government of Tajikistan represented by
the Ministry of Energy, and AES Corporation (U.S.) represented
by AES Silk Road Inc. (fully owned by AES Corporation).

Parties agreed to incorporate a Transmission Company to
implement the Project agreed on principle Build - Operate -
Transfer (BOT)

Project will: (i) build two-circuit transmission line 220KV (90
km) to Afghanistan border; (ii) open a representative office;


DUSHANBE 00000493 003.2 OF 003


Parties agreed to:

AES and Ministry of Energy will establish a company that will
(i) implement the project; (ii) manage and own all facilities as
provided in the project;

Shares of each party in the Company will be determined upon
completion of Feasibility Study;

Project will be implemented on phase-by-phase basis;

Schedule:

March 10, 2006 - signing of proposed Memorandum of Intent;
March 20, 2006 - expected signing date for BOT Agreement between
AES and Ministry of Energy;
July 30, 2006 - expected completion of feasibility study;
August 31, 2006 - expected date when Basic Agreements will come
into effect
September 15, 2006 - expected approval on final Feasibility
Study. Negotiations with Government of Tajikistan on proposed
articles of agreement by AES
October 2006 - inception of Agreements of the Project
November 2006 - obtaining investment license for project
implementation
February 2007 - proposed financing proposal will be available
March - 2007 - inception of construction works
November 2007 - completion of construction works
HOAGLAND