Bridgetown Final Accreditation
VZCZCXYZ0002 PP RUEHWEB DE RUEHWN #1721 2692058 ZNR UUUUU ZZH P 262058Z SEP 06 FM AMEMBASSY BRIDGETOWN TO SECSTATE WASHDC PRIORITY 3392
UNCLAS BRIDGETOWN 001721
SIPDIS
SIPDIS
SENSITIVE
DEPT FOR OBO/PE/CC, DS/PSD/CAT
E.O. 12958: N/A
TAGS: ABLD ASEC AMGT BB
SUBJECT: Bridgetown Final Accreditation
REF: State 051870
UNCLAS BRIDGETOWN 001721
SIPDIS
SIPDIS
SENSITIVE
DEPT FOR OBO/PE/CC, DS/PSD/CAT
E.O. 12958: N/A
TAGS: ABLD ASEC AMGT BB
SUBJECT: Bridgetown Final Accreditation
REF: State 051870
1. (SBU) Per reftel, OBO/Bridgetown confirms that the New Embassy
Compound (NEC) is ready for the final accreditation inspection.
OBO/Bridgetown sent updated accreditation checklists via C-Lan in
late August and last week.
2. (SBU) OBO/Bridgetown confirms that the following work is complete
or is scheduled to be complete prior to the start of accreditation
on October 2, 2006.
a. All finish work in areas to be inspected is complete.
b. Perimeter barrier is complete, to include required compound
access control facilities.
c. All CAA furnishings installed by appropriately cleared
personnel.
d. Forced entry/ballistic resistant (FE/BR) products installed and
fully functional.
e. Alarm systems installed and fully functional.
f. Selectone public address system installed and fully functional.
g. All general contracting complete (plumbing, fire suppression
systems, electrical, etc.)
h. All telephone systems serving the CAA installed and fully
functional.
i. All locking hardware installed, functional, and with appropriate
keying or combinations.
j. MSG Post one is complete and fully functional - move-in
condition.
3. (U) Please address any questions/comments to OBO/Bridgetown
Project Director - Lawrence P. Ostrowski at
or 1-246-427-6819 (office phone).
KRAMER
SIPDIS
SIPDIS
SENSITIVE
DEPT FOR OBO/PE/CC, DS/PSD/CAT
E.O. 12958: N/A
TAGS: ABLD ASEC AMGT BB
SUBJECT: Bridgetown Final Accreditation
REF: State 051870
1. (SBU) Per reftel, OBO/Bridgetown confirms that the New Embassy
Compound (NEC) is ready for the final accreditation inspection.
OBO/Bridgetown sent updated accreditation checklists via C-Lan in
late August and last week.
2. (SBU) OBO/Bridgetown confirms that the following work is complete
or is scheduled to be complete prior to the start of accreditation
on October 2, 2006.
a. All finish work in areas to be inspected is complete.
b. Perimeter barrier is complete, to include required compound
access control facilities.
c. All CAA furnishings installed by appropriately cleared
personnel.
d. Forced entry/ballistic resistant (FE/BR) products installed and
fully functional.
e. Alarm systems installed and fully functional.
f. Selectone public address system installed and fully functional.
g. All general contracting complete (plumbing, fire suppression
systems, electrical, etc.)
h. All telephone systems serving the CAA installed and fully
functional.
i. All locking hardware installed, functional, and with appropriate
keying or combinations.
j. MSG Post one is complete and fully functional - move-in
condition.
3. (U) Please address any questions/comments to OBO/Bridgetown
Project Director - Lawrence P. Ostrowski at
or 1-246-427-6819 (office phone).