MORE DETAILS ON JORDAN PROVIDING ELECTRICITY TO
VZCZCXYZ0000 PP RUEHWEB DE RUEHAM #7695 2831015 ZNY CCCCC ZZH P 101015Z OCT 06 FM AMEMBASSY AMMAN TO RUEHC/SECSTATE WASHDC PRIORITY 4701 INFO RUEHXK/ARAB ISRAELI COLLECTIVE RUEATRS/DEPT OF TREASURY WASHDC RUEHBS/USEU BRUSSELS
C O N F I D E N T I A L AMMAN 007695
SIPDIS
SIPDIS
E.O. 12958: DECL: 10/09/2026
TAGS: ENRG PREL KWBG JO
SUBJECT: MORE DETAILS ON JORDAN PROVIDING ELECTRICITY TO
JERICHO
REF: JERUSALEM 4335
Classified By: CDA Daniel Rubinstein, Reasons 1.4 (b) and (d).
C O N F I D E N T I A L AMMAN 007695
SIPDIS
SIPDIS
E.O. 12958: DECL: 10/09/2026
TAGS: ENRG PREL KWBG JO
SUBJECT: MORE DETAILS ON JORDAN PROVIDING ELECTRICITY TO
JERICHO
REF: JERUSALEM 4335
Classified By: CDA Daniel Rubinstein, Reasons 1.4 (b) and (d).
1. (C) Further to reftel, Jordan's Energy Minister Azmi
Khreisat told Ecouns October 5 that the country's NEPCO power
company will supply the Jerusalem District Electricity
Company (JDECO) with electricity in a project which will
require two phases. The project comes at Palestinian
request, and will not be profitable for Jordan, according to
Khreisat. Rates will be set to only cover costs, but are
designed to track the fluctuating prices of the fuel used to
generate the power. Khreisat emphasized that the 20 MW of
power from the project will be supplied only to Jericho, not
to other areas of the West Bank.
2. (C) The first phase of the project will consist of
building the 132 KV line on the Jordanian side from Jordan's
existing grid to within one kilometer of the border with the
West Bank. The second phase will include upgrading a
substation on the Jordanian side. Khreisat expects the
project to be completed by summer 2007.
RUBINSTEIN
SIPDIS
SIPDIS
E.O. 12958: DECL: 10/09/2026
TAGS: ENRG PREL KWBG JO
SUBJECT: MORE DETAILS ON JORDAN PROVIDING ELECTRICITY TO
JERICHO
REF: JERUSALEM 4335
Classified By: CDA Daniel Rubinstein, Reasons 1.4 (b) and (d).
1. (C) Further to reftel, Jordan's Energy Minister Azmi
Khreisat told Ecouns October 5 that the country's NEPCO power
company will supply the Jerusalem District Electricity
Company (JDECO) with electricity in a project which will
require two phases. The project comes at Palestinian
request, and will not be profitable for Jordan, according to
Khreisat. Rates will be set to only cover costs, but are
designed to track the fluctuating prices of the fuel used to
generate the power. Khreisat emphasized that the 20 MW of
power from the project will be supplied only to Jericho, not
to other areas of the West Bank.
2. (C) The first phase of the project will consist of
building the 132 KV line on the Jordanian side from Jordan's
existing grid to within one kilometer of the border with the
West Bank. The second phase will include upgrading a
substation on the Jordanian side. Khreisat expects the
project to be completed by summer 2007.
RUBINSTEIN