Identifier
Created
Classification
Origin
06AMMAN7695
2006-10-10 10:15:00
CONFIDENTIAL
Embassy Amman
Cable title:  

MORE DETAILS ON JORDAN PROVIDING ELECTRICITY TO

Tags:  ENRG PREL KWBG JO 
pdf how-to read a cable
VZCZCXYZ0000
PP RUEHWEB

DE RUEHAM #7695 2831015
ZNY CCCCC ZZH
P 101015Z OCT 06
FM AMEMBASSY AMMAN
TO RUEHC/SECSTATE WASHDC PRIORITY 4701
INFO RUEHXK/ARAB ISRAELI COLLECTIVE
RUEATRS/DEPT OF TREASURY WASHDC
RUEHBS/USEU BRUSSELS
C O N F I D E N T I A L AMMAN 007695 

SIPDIS

SIPDIS

E.O. 12958: DECL: 10/09/2026
TAGS: ENRG PREL KWBG JO
SUBJECT: MORE DETAILS ON JORDAN PROVIDING ELECTRICITY TO
JERICHO

REF: JERUSALEM 4335

Classified By: CDA Daniel Rubinstein, Reasons 1.4 (b) and (d).

C O N F I D E N T I A L AMMAN 007695

SIPDIS

SIPDIS

E.O. 12958: DECL: 10/09/2026
TAGS: ENRG PREL KWBG JO
SUBJECT: MORE DETAILS ON JORDAN PROVIDING ELECTRICITY TO
JERICHO

REF: JERUSALEM 4335

Classified By: CDA Daniel Rubinstein, Reasons 1.4 (b) and (d).


1. (C) Further to reftel, Jordan's Energy Minister Azmi
Khreisat told Ecouns October 5 that the country's NEPCO power
company will supply the Jerusalem District Electricity
Company (JDECO) with electricity in a project which will
require two phases. The project comes at Palestinian
request, and will not be profitable for Jordan, according to
Khreisat. Rates will be set to only cover costs, but are
designed to track the fluctuating prices of the fuel used to
generate the power. Khreisat emphasized that the 20 MW of
power from the project will be supplied only to Jericho, not
to other areas of the West Bank.


2. (C) The first phase of the project will consist of
building the 132 KV line on the Jordanian side from Jordan's
existing grid to within one kilometer of the border with the
West Bank. The second phase will include upgrading a
substation on the Jordanian side. Khreisat expects the
project to be completed by summer 2007.
RUBINSTEIN

Share this cable

 facebook -  bluesky -