Identifier
Created
Classification
Origin
05VILNIUS367
2005-04-07 12:59:00
CONFIDENTIAL
Embassy Vilnius
Cable title:  

LITHUANIA PROVIDES UPDATED REQUIREMENT LITH FOR

Tags:  MOPS MCAP MARR PREL PGOV LH AF 
pdf how-to read a cable
This record is a partial extract of the original cable. The full text of the original cable is not available.
C O N F I D E N T I A L SECTION 01 OF 03 VILNIUS 000367 

SIPDIS

STATE FOR EUR/NB, EUR/RPM (SWANDERSON),PM/PPA (SKWAK)

E.O. 12958: DECL: 04/06/2015
TAGS: MOPS MCAP MARR PREL PGOV LH AF
SUBJECT: LITHUANIA PROVIDES UPDATED REQUIREMENT LITH FOR
ITS PRT

REF: A. VILNIUS 257

B. VILNIUS 198

C. VILNIUS 103

Classified By: Political/Economic Officer Alexander Titolo for reasons
1.4 (b) and (d)

C O N F I D E N T I A L SECTION 01 OF 03 VILNIUS 000367 SIPDIS STATE FOR EUR/NB, EUR/RPM (SWANDERSON),PM/PPA (SKWAK) E.O. 12958: DECL: 04/06/2015 TAGS: MOPS MCAP MARR PREL PGOV LH AF SUBJECT: LITHUANIA PROVIDES UPDATED REQUIREMENT LITH FOR ITS PRT REF: A. VILNIUS 257 ¶B. VILNIUS 198 ¶C. VILNIUS 103 Classified By: Political/Economic Officer Alexander Titolo for reasons 1.4 (b) and (d) ¶1. (U) SUMMARY: The GOL updated and augmented its needs assessment for the Lithuanian-led Provincial Reconstruction Team (PRT) in the desolate Ghowr province of western Afghanistan. Following the March 30 return from Afghanistan of Lithuania's PRT reconnaissance team, the MFA advanced us a copy of the revised list of requirements they will present to SHAPE. The limited accessibility of Chaghcharan, airfield maintenance issues, and harsh weather conditions prompted addition of most new items. The new list consolidates resources the GOL anticipates requiring to stand up the 150-person PRT. The GOL will be working through SHAPE to help them fill the order. END SUMMARY. ¶2. (U) The new list is predicated on GOL assumptions that: -- construction of the base camp will be complete before the onset of winter (hence the demanding air lift schedule for delivery of men and materials); -- the full PRT complement of 140-150 individuals will deploy by October; -- the PRT will establish mobile units in each of Ghowr province's seven districts (hence the large number of night vision goggles); -- the camp will operate year-round (hence the equipment to keep the airfield operational); and -- the PRT will construct a camp using local materials (stone) and local labor that will be of use to the community when the PRT completes its mission and withdraws. -------------- The List of PRT Support Requirements -------------- ¶3. (U) The MFA provided the list below on April 2. MOD authorities had, at that time, not yet signed off on the document. MFA passed it on, therefore, as a notional text. It is now an official, fully cleared GOL document, which the Lithuanian Delegation presented on April 5 to the U.S. Delegation (OSD, Joint Staff J5, EUCOM J5 and USDAO Vilnius) at the US-LH Bilateral Working Group in Garmisch, Germany. Lithuanian Delegation informed DATT that the Lithuanian NMR also provided the list to SHAPE. Begin list: Strategic airlift for the deployment and sustainment of the PRT: �
0A;-- Strategic airlift (12-15 sorties of C-17) is required from SIAULIAI (ZOKNIAI) (Lithuania) to HERAT 06 -- 20 JUN 2005 Lithuania had to change planned PRT IOC dates because HERAT FSB is planned to have IOC only on 1 JUN. -- 1 sortie of strategic airlift a week or fortnightly to sustain PRT from ZOKNIAI to HEART beyond 1 July 2005. Using RAMSTEIN airbase is also possible. Additional personnel, equipment and capabilities (footnote 1): -- Airfield support capability in CHAGHCHARAN (Deployable Operating Base): -------------- Refueling for helicopters of at least 4000 LBS -------------- Airfield support personnel -------------- Fire-engine -------------- All required equipment to keep the airfield operational -------------- 1 Road Grader -------------- 1 Drum Roller -------------- 2 MHE, 3.5T and l0T Rough Terrain Fork lifts with man basket to on/off load C-130 aircraft. -------------- 2 Portable Light Sets -------------- 1 Water truck for spreading water for dust control and compaction -------------- Air navigation equipment to keep airfield operational in any weather conditions Tactical Air Control Party 1 Counter intelligence officer (with Dari dialect skills). General Project manager/engineer and Quality Assurance Representative for the base engineering project supervision. Support in designing the PRT camp and preparing technical specifications. Equipment for PRT and base camp operations: --6 armed HMMWV M1114 with mounted machine guns (12,7 mm) --8 ground-air radios (PRC-117F) --10 external crypto devices for radio stations (HF/ VHF) --GPS -- 21 pieces; --Night vision goggles (PVS-14 (F6015) (III /IV generation) 87 pieces; --Mobile thermo-vision binoculars -- 12 pieces --Blue Force tracker -- 9 pieces; --Storage tanks for: -------------- Fuel for FOC -- 50,00--liter steel tanks -- 1--pieces -------------- Fuel for IOC -- 10,000--liter bladders -- 7 pieces -------------- Fresh water -- 1500--L plastic -- 2 pieces -------------- Fresh water -- 3500--L plastic -- 1 piece --Fuel testing kit -- 2 pieces --8'/20' containers-refrigerators 4 chillers / 2 freezer --8'/20' containers for dry storage -2 --8'/20' containers for ammunition -- 2 --8'/20' containers for personnel bunkers -- 10 --GP medium tents with environmental control unit for IOC -- 20 pieces --Base equipment: -------------- 5 generators for IOC; 3 -- 30 KW primary and 2 -- 10 KW for backup to medical and JOC bldgs. --5 generators for FOC; 3 -- 500 KW primary --HESCOS MIL 10-bastions for bunkers, fuel storage area and entrance control -- 100 pieces (MIL 10-specifications -- 2.12 m. height: 1.52 m. width: 30.5 m. length) --Concertina, barbed wire -- up to 10km; --8'/20' containers, temperature controlled for water for IOC --Containers for storage -- 15 --Stationary water purification station 15,000-L/day -- 1 --Gators -- rough terrain small cargo vehicles -- 6 pieces --Bobcat with track and bucket loader, forks, post hole digger, trenching attachment --Medical equipment: --Patient vital signs monitor (Propaq) -- 2 --Mobile X-Ray unit (with digital imaging system) -- 1 --Portable diagnostic ultrasound imaging system -- 1 --Chemical agent water testing kit -- 1 --Water testing kit-bacteriological -- 1 --Food chemical agent detector kit -1 --Multi colorimeter and test kit -- 1 --Thermostat/mini incubator -1 --Homogenizer -- 1 --Warm gear, full body- 5 --Serum against snakebite (the right for Afghanistan region, ready to use) -- 3 --Morphine sulphate 10mg auto injector syringes with needle -- 1500 pieces Personnel training for PRT: --HMMWV drivers and mechanics training conducted in Lithuania at the end of April (and) beginning of May; --HMMWV drivers training in theatre; --IED specialist training conducted in Lithuania in May; --Support in PRT HQ training and supervision of the PRT training conducted in May in Lithuania; Training of 10 Forward Air Controllers for the PRT. Might be conducted in theatre. (footnote 1) As of present CHAGHCHARAN airfield is in unusable condition. To bring up and maintain airfield in a serviceable condition Lithuania would require substantial assistance with reconstruction effort, additional personnel and special equipment. End list. ¶4. (U) We note that the GOL has already requested some items in previous, non-PRT-related lists of anticipated needs; some items are already in the pipeline; and some items may be in the Lithuanian military's own warehouses. ¶5. (C) Comment: Whether or not Lithuania's determined military leaders can meet their exacting timetable and establish a fully operational 150-person team in Afghanistan by next winter remains to be seen. Even if the goal slips to 2006, long lead times for military procurement mean that it's time to equip the PRT now. Lithuania will look to NATO allies to provide resources beyond its own limited means. Mull

Share this cable

 facebook -  bluesky -