Identifier
Created
Classification
Origin
05GENEVA2487
2005-10-14 09:28:00
SECRET
US Mission Geneva
Cable title:  

ESO GENEVA QUARTERLY ACTIVITY REPORT

Tags:  ASEC KSEO 
pdf how-to read a cable
This record is a partial extract of the original cable. The full text of the original cable is not available.
S E C R E T SECTION 01 OF 02 GENEVA 002487 SIPDIS DEPT FOR DS/STO/OSB, FRANKFURT FOR ESC E.O. 12958: DECL: 11/01/2015 TAGS: ASEC KSEO SUBJECT: ESO GENEVA QUARTERLY ACTIVITY REPORT Classified By: OIC/ESO Greg Battistone, reason 1.5 (C, G). 1.0 (U) Reporting period 01 July - 30 September 2005 2.0 (U) Services performed: Post Personnel Dates Cost ($) 2.1 (U) Prague STS Grambley 7/6-8 1700 Engineering services, ESSR Prague-ESO Geneva-2005-010 Airfare: Unrestricted: $1800, Restricted $900 2.2 (U) Bern SEO Kemeny 7/27-28 375 Engineering services, ESSR Bern-ESO Geneva-2005-011 2.3 (U) Bern SEO Kemeny 8/3-4 375 Engineering services, ESSR Bern-ESO Geneva-2005-012 2.2 (U) Prague SEO Kemeny 8/9-11 1700 Engineering services, ESSR Prague-ESO Geneva-2005-013 Airfare: Unrestricted: $1800, Restricted $600 2.4 (U) Bern SEO Kemeny, SEO Battistone 8/23 0 Post familiarization 2.5 (U) Prague STS Grambley 8/29-9/2 2000 Engineering services, Prague-ESO Geneva-2005-014 Airfare: Unrestricted: $1700, Restricted $500 2.6 (U) Bern STS Grambley, SEO Battistone 9/12 0 Engineering Services, TAR 2005-011 2.7 (U) Bern STS Grambley 9/27-9/28 750 Engineering Services, TAR 2005-012 2.9 (U) The ESO has used restricted fares for over three years. The total potential restricted airfare cost savings over unrestricted fares (or GOV use) this quarter would have been $3300. The above numbers are approximate given the fluctuating exchange rate. 2.10 (C) POR support 7/1/05 - 9/30/05 - Inspected items destined for CAA - Preventative maintenance done on posts' Itemizer and x-ray machines - Final inspection on the Photovoltaic project - Periodic checks on the CAC/perimeter fence project - Removed all technical security equipment from the old CAC before its demolition - Installed temporary CCTV, ENS and IDNS equipment in the temporary CAC - Replaced failed power supply in the reception AS&E 66Z x-ray machine - Assisted in the relocation of reception AS&E 66Z x-ray machine to area adjacent to Post One - Relocated alarm components in tel frame room during renovation of office space - Assisted RSO with physical security needs during 23 Sep demonstration at Mission 3.0 (U) Travel statistics. Personnel - days TDY/days in QT = percentage Kemeny - 7/55 = 13 Battistone - 4/44 = 9 Grambley - 11/92 = 12 4.0 (U) TSCM/TSA Program Status 4.1 (C) TSCM Status Post Last TSCM ESSR Geneva 3/2004 Bern 11/2002 Prague NA Zurich NA 4.2 (C) TSA Status Post Last TSA Geneva 5/2004 Bern 9/2004 Prague 2/2004 Zurich 9/2004 5.0 (U) Unanswered telegrams: None 6.0 (C) Administrative events SEO Kemeny was on A/L July 15-22 STS Grambley was on A/L 7/26-29 SEO Battistone arrived post August 17 and assumed charge of the ESO August 23 SEO Kemeny departed post August 25. Cassel

Share this cable

 facebook -  bluesky -