Identifier
Created
Classification
Origin
08STATE50705
2008-05-13 19:07:00
UNCLASSIFIED
Secretary of State
Cable title:  

BLUE LANTERN PRE-LICENSE END USE CHECK ON

Tags:  DA ETTC KOMC RS UK 
pdf how-to read a cable
VZCZCXYZ0026
RR RUEHWEB

DE RUEHC #0705 1341914
ZNR UUUUU ZZH
R 131907Z MAY 08
FM SECSTATE WASHDC
TO RUEHMO/AMEMBASSY MOSCOW 0000
INFO RUEHCP/AMEMBASSY COPENHAGEN 0000
RUEHLO/AMEMBASSY LONDON 0000
RHMCSUU/FBI WASHINGTON DC 0000
RUEKJCS/SECDEF WASHINGTON DC
RUCPDOC/USDOC WASHINGTON DC 0000
RUEPINS/HQ BICE INTEL WASHINGTON DC
UNCLAS STATE 050705 

SIPDIS
FOR POL MIL NICKOLAS G. KATSAKIS

E.O. 12958: N/A
TAGS: DA ETTC KOMC RS UK
SUBJECT: BLUE LANTERN PRE-LICENSE END USE CHECK ON
APPLICATION 05-050101397


UNCLAS STATE 050705

SIPDIS
FOR POL MIL NICKOLAS G. KATSAKIS

E.O. 12958: N/A
TAGS: DA ETTC KOMC RS UK
SUBJECT: BLUE LANTERN PRE-LICENSE END USE CHECK ON
APPLICATION 05-050101397



1. This is an action message. See paragraphs 2-6.


2. The Department's Office of Defense Trade Controls
Compliance (PM/DTCC) requests post assistance in conducting a
pre-license check for the export of radiation tolerant DC/DC
converters to Russia. Post is requested to complete this
Blue Lantern check within 30 days. Lack of response to a
Blue Lantern check will affect pending and future licenses
involving parties to this license.


3. Reason for request: the Russian entities listed on this
license application have no licensing history with our
office. The requested commodity is designed for use in low
earth orbit satellites and launch vehicles. The license
application states that the commodity will be used in a fire
alarm and security system (FASS) at a nuclear power plant.


4. ACTION: Please contact the Foreign End User, Russian
Ministry of Atomic Energy, to determine if they can confirm
this specific order for components, and the use of these
components by the Foreign Consignee TENZOR for a FASS
intended for the Novovoronezh Nuclear Power Plant.


5. Contact the Novovoronezh Nuclear Power Plant. Inquire
with Novovoronezh to ascertain if they can confirm this
specific order for components, and the use of these
components by the Foreign Consignee TENZOR for a FASS
intended for the plant.


6. Finally, please contact Foreign Consignee JSC Instrument
Plant TENZOR. Ask TENZOR to explain why they need radiation
tolerant satellite components for the FASS of Novovoronezh.
(A nuclear plant expert contacted by PM/DTCC did not
understand why radiation tolerant components would be used in
a FASS because such systems are not located in radioactive
areas.) Also ask TENZOR if all of the requested components
will be used in the Novovoronezh plant FASS, or were any
extra components ordered for stockpiling and use on another
program? END ACTION.


7. License Information:

DDTC Case Number 05-050101397

QUANTITY/COMMODITY:

05 High Reliability DC/DC Converters Modules, P/N:
M3L2803R3S

11 DC/DC Converter Modules, P/N: M3L2805D

01 Technical Data: Tree Analysis, ELDERS Testing,
Thermal Analysis, FMCEA reports

LICENSE VALUE: USD 46,225.00

APPLICANT:

International Rectifier Corporation
233 Kansas Street
El Segundo, California 90245 USA

SOURCE:

International Rectifier Corporation
2270 Martin Avenue
Santa Clara, California 95050 USA

FOREIGN INTERMEDIATE CONSIGNEES:

Expeditors International Ltd.
Unit 2 Polar Park Bath Road
Harmondsworth, Middlesex UB7 0DG
UNITED KINGDOM

DHL Global Forwarding
Danzas House Kestrel Way
Hayes, Middlesex UB3 1HJ

Exel Global Logistics GB
Service House, Great South West Road Hatton Cross
Feltham, Middlesex TW14 0PL

IR Denmark APS
Literbuen 10C
DK-2740 Slovlunde
DENMARK

JSC MicroEM
4 Savelkinsky Proezd, Zelenograd
124482 Moscow
RUSSIA

FOREIGN CONSIGNEES:

Symmetron
7 Tallinskaya Str.
195196 St. Petersburg
RUSSIA

Novovoronezh Nuclear Power Plant
Novovoronezh City
396072 Voronegh Region
RUSSIA

JSC Instrument Plant TENZOR
2 Priborostroiteley Str.
Dubna
141980 Moscow Region
RUSSIA

FOREIGN END USER:

Russian Ministry of Atomic Energy (Minatom)
24/26 Bolshaya Ordynka Str.
119017 Moscow
RUSSIA

STATEMENT OF PURPOSE:

The components will be delivered to TENZOR who will test and
integrate them into a Fire Alarm and Security System (FASS)
for the Novovoronezh Nuclear Power Plant. The Foreign End
User, Ministry of Atomic Energy, is sponsoring the program.


8. Additional documentation submitted in support of license
application:

A) Symmetron Purchase Order Number R071119STHR-565BO, dated
28 March 2008, signed by Savina Olga, General Director.

B) JSC Instrument Plant TENZOR ITAR Parts Control and
Accountability Plan, listing Symmetron Purchase Order Number
and end-use Program FASS


9. Please slug reply for PM/DTCC - BLUE LANTERN COORDINATOR
and include the words "Blue Lantern" and the DDTC Case Number
in the subject line. POC on this case is Peter Sabatini,
PM/DTCC, phone: 202-663-2819; ClassNet email:
sabtinipj@state.sgov.gov; OpenNet email:
sabatinipj@state.gov. The 2006 Blue Lantern Guide Book is
available on OpenNet at
http://fsi.state.gov/fsi/spas/default.asp?ID= 1588
Department thanks Post for its assistance in this matter.
RICE