Identifier
Created
Classification
Origin
06BRIDGETOWN1721
2006-09-26 20:58:00
UNCLASSIFIED//FOR OFFICIAL USE ONLY
Embassy Bridgetown
Cable title:  

Bridgetown Final Accreditation

Tags:  ABLD ASEC AMGT BB 
pdf how-to read a cable
VZCZCXYZ0002
PP RUEHWEB

DE RUEHWN #1721 2692058
ZNR UUUUU ZZH
P 262058Z SEP 06
FM AMEMBASSY BRIDGETOWN
TO SECSTATE WASHDC PRIORITY 3392
UNCLAS BRIDGETOWN 001721 

SIPDIS

SIPDIS

SENSITIVE

DEPT FOR OBO/PE/CC, DS/PSD/CAT

E.O. 12958: N/A
TAGS: ABLD ASEC AMGT BB
SUBJECT: Bridgetown Final Accreditation

REF: State 051870

UNCLAS BRIDGETOWN 001721

SIPDIS

SIPDIS

SENSITIVE

DEPT FOR OBO/PE/CC, DS/PSD/CAT

E.O. 12958: N/A
TAGS: ABLD ASEC AMGT BB
SUBJECT: Bridgetown Final Accreditation

REF: State 051870


1. (SBU) Per reftel, OBO/Bridgetown confirms that the New Embassy
Compound (NEC) is ready for the final accreditation inspection.
OBO/Bridgetown sent updated accreditation checklists via C-Lan in
late August and last week.


2. (SBU) OBO/Bridgetown confirms that the following work is complete
or is scheduled to be complete prior to the start of accreditation
on October 2, 2006.

a. All finish work in areas to be inspected is complete.

b. Perimeter barrier is complete, to include required compound
access control facilities.

c. All CAA furnishings installed by appropriately cleared
personnel.

d. Forced entry/ballistic resistant (FE/BR) products installed and
fully functional.

e. Alarm systems installed and fully functional.

f. Selectone public address system installed and fully functional.

g. All general contracting complete (plumbing, fire suppression
systems, electrical, etc.)

h. All telephone systems serving the CAA installed and fully
functional.

i. All locking hardware installed, functional, and with appropriate
keying or combinations.

j. MSG Post one is complete and fully functional - move-in
condition.


3. (U) Please address any questions/comments to OBO/Bridgetown
Project Director - Lawrence P. Ostrowski at
or 1-246-427-6819 (office phone).

KRAMER