S E C R E T SECTION 01 OF 03 ABUJA 001606 

SIPDIS


E.O. 12958: DECL: 05/29/2012
TAGS: EIND PGOV EFIN ECON NI
SUBJECT: NIGERIA: GON CORRUPTION REDUCED BUT FAR FROM
ELIMINATED BY PRESIDENT OBASANJO'S DUE PROCESS INITIATIVE


S E C R E T SECTION 01 OF 03 ABUJA 001606

SIPDIS


E.O. 12958: DECL: 05/29/2012
TAGS: EIND PGOV EFIN ECON NI
SUBJECT: NIGERIA: GON CORRUPTION REDUCED BUT FAR FROM
ELIMINATED BY PRESIDENT OBASANJO'S DUE PROCESS INITIATIVE



1. (U) Classified by Charge Timothy D. Andrews; Reasons 1.5
(b) and (d).



2. (S) Summary. Due Process Certification is the Obasanjo
Administration's most effective anti-corruption measure to
date. The process requires what appears to be a cost-benefit
analysis for all GON capital expenditures over N1 million
and, according to the Presidential Special Advisors in charge
of the process, it has saved the GON billions of Naira the
past six months alone. Executive branch officials, including
the Minister of Solid Minerals, have commented that Due
Process Certification has tightened belts, forcing Ministers
to apply rational pricing and transparency to their
contracting practices. However effective this process may
be, it only governs the contract award phase of the project.
There is not a similar oversight mechanism for project
implementation. The President's Chief Economic Advisor
Magnus Kpakol (strictly protect) has admitted that
significant corruption still occurs during the contract
implementation phase. End Summary.



3. (U) In mid-2001, President Obasanjo established the Budget
Price Monitoring and Investigation Unit (BMPI),mandated with
reviewing on all national capital expenditures over N1
million (USD 8600.00). In October 2001, the GON formalized
this procedure, termed Due Process Certification, in a
Circular issued by the Accountant General of the Federation.
Mrs. Oby Ezekwesili, Special Advisor to the President,
oversees the BPMI Unit and was eager to convey its success at
having saved the GON billions of Naira.



4. (U) All federal capital projects over N1 million Naira
must undergo three stages of certification: (1) Budget
Preparation Certification, (2) Contract Award Process
Certification, and (3) Work Completion Certification.
According to Ezekwesili, all capital projects contained in
the 2002 Budget had been subject to the first of the three
stages. Each Ministry must submit its project proposals for
consideration by the President. Every proposal must include

a feasibility study on the availability of the site, building
materials, labor and external services, such as water and
power supply, as well as an articulation of demand for the
project. BMPI bases its decision to grant certification on
whether the project will have a positive impact on
employment, increase efficiency and productivity and improve
service to the public. Budget Preparation Certification is
granted if the project is determined to:


-- Be well aligned with GON strategic and sectoral priorities;


-- Be adequately prepared technically and financially;


-- Contain reasonable cost estimates consistent with
international practice;


-- Include detailed project designs with appropriately
packaged components for procurement purposes;


-- Include detailed and realistic financing, procurement and
implementation plans;


-- Identify adverse environmental and social effects where
these exist; and


-- Include an assessment of future operation and maintenance
requirements.



5. (U) Projects are granted Category 1, or full,
certification if they meet all the above criteria. Category
2 certification is granted to projects not fully prepared but
which could be completed within the next budget cycle.
Category 3 projects are denied certification because they are
significantly flawed or incomplete. Only Category 1 projects
were included in the draft 2002 Budget the President
submitted to the National Assembly. According to Ezekwesili,
the Assembly inserted several non-certified projects prior to
the budget's final approval.



6. (U) Once the budget is approved by the legislature, the
BMPI works closely with each Ministry's finance office on the
second stage of certification, Contract Award Certification.
Before a contract can be awarded, the following conditions
must be met:


-- Tender documents are prepared in line with GON guidelines;


-- Tender process is conducted in line with GON guidelines;


-- Pre-qualification criteria for contractors are
appropriate, clearly stated and fully complied with;


-- The lowest/best-evaluated bidder is recommended or if
management approves a different bidder, reasons for that
recommendation have been provided;
-- Contract price is comparable with international
experience; and


-- The successful bidder continues to meet pre-qualification
requirements.


Only after the BMPI has issued the Contract Award
Certification can the Ministry sign the contract and begin
mobilizing the funds through the Accountant General and
Central Bank.



7. (U) Any project that requires more than one release of
funds must receive a Work Completion Certification from BMPI
before the relevant Ministry is able to access additional
funds. To receive that certification, the project must meet
the following conditions:


-- Earlier funds have been fully utilized;


-- Site visit has been carried out to assess progress;


-- Contract work is being carried out as agreed in contract;


-- Percentage of work completed is commensurate with funds
spent; and


-- Anticipated project results are being achieved.



8. (C) BMPI uses specialists from outside the career
government service )- sometimes even expatriates -- to
conduct these reviews. Ezekwesili admitted, however, that
finding technically proficient and honest specialists has
been difficult. She requested assistance from USAID in
locating and funding outside specialists, particularly for
infrastructure projects, such as roads, water and seaports.
USAID has agreed to provide this assistance to BMPI.



9. (U) She believes strongly that, through the BMPI,
President Obasanjo has greatly reduced federal level
corruption and that, through due process, oversight over
contract procurement has been greatly enhanced. "We have
taken meat from the table of those who normally eat pork,"
she said. Ezekwesili praised the work of the BMPI as
compared to the Anti-Corruption Commission, which she said
lacks teeth. Inflated contracts, patronage and
misappropriation of federal resources were common occurrences
before, but no longer, she averred. As an example,
Ezekwesili cited a project proposed by the Ministry of Power
and Steel that was going at a price well above the lowest
bidder. Certification was not granted until the contract
amount was reduced, saving the GON roughly N2 billion (USD 17
million). On buildings and road projects alone, she
estimated that roughly N9.7 billion (USD 83 million) had been
saved in the past six months alone.



10. (U) Ezekwesili emphasized that President Obasanjo has
given his full support to the certification process. In
early April, she said the President informed all Ministers
during the weekly Executive Council meeting, that none of
them should bother submitting a project for the Council's
approval without a due process evaluation. The Minister of
Solid Minerals Adelaja (and former Minister of State for
Defense),during a farewell dinner for the DATT on April 23,
commented that the due process exercise was extremely
positive, ensuring Executive branch contracts were rational
in scope and cost. When some expressed concern over
potential delays due to the process, Adelaja countered that
minor delays were a small price to pay to prevent corrupt
contracting and to ensure rational projects.



11. (U) When asked about specific projects that are often
criticized as wasteful, such as the Abuja stadium and
National Identification Program, Ezekwesili explained these
programs pre-dated the establishment of BMPI, and were driven
by political concerns. BMPI audited the Stadium construction
and concluded, "this project has serious deviations from due
process. This is of particular concern bearing in mind the
huge amount of expenditure anticipated, some N38 Billion, or
$300 million equivalent. However, given the delicate
international aspects of the project and the need for Nigeria
to demonstrate its ability to host the All African Games and
provide a sufficient range of facilities and accommodation to
do so, it would be politically impossible to recommend the
project be reviewed or delayed in any way."



12. (C) Comment. We join the IMF and World Bank in giving
the GON good marks for institutionalizing due process
regarding federal capital expenditures, and will continue to
give the BMPI project support as it moves into the Ministry
of Finance Budget Office. This project has certainly limited
the mischief in the award of government contracts. However,
just as water will find its way through stone, so too will
creative GON officials continue to find ways to manipulate
the contracting process for personal gain. Moreover, as long
as the Anti-Corruption Commission "lacks teeth" (i.e.,
sufficient authority and funding) and the Code of Conduct
Tribunal lacks independence, few will be punished for
engaging in (or attempting to engage in) corrupt practices.
Ezekwesili may have saved the GON USD 17 million in the case
she cited, but no heads rolled at Power and Steel because of
it. In addition, allowing politics to override due process
is a slippery slope.



13. (S) In a private conversation, the President's Chief
Economic Advisor, Magnus Kpakol, admitted that while BMPI has
reduced malfeasance, plenty of opportunities for Ministers
and other high-level GON officials to manipulate the system
still exist. While the BMPI may ensure that contracts are
awarded at an appropriate price to an appropriate bidder,
there is no mechanism in place (except if the project has
several stages and must go through the Work Completion
Certification) to ensure that the contract is fulfilled. The
way the BMPI is structured may actually encourage schemes
that pay the full contract amount up front thus avoiding the
site visit and work percentage requirements of the work
completion certification (see para 6). Additionally, clever
operators can break a large project into several discrete
contracts with each less than one million Naira in order to
fall below BMPI's regulatory radar screen. Several GON
insiders give much credit to President Obasanjo's leadership
against corruption and cite BMPI as an example. Although a
successful step forward, BMPI's due process certification has
its gaps that are almost assuredly being exploited by corrupt
officials. To further the fight against misconduct in
government contracting practices, an important step the GON
should explore is improving its oversight of the actual
performance of government contracts. End Comment.